Legal Representation
Attorney
Rhett V. Barney
Application History
2 events| Date | Code | Type | Description | Documents |
|---|---|---|---|---|
| Aug 21, 2025 | MAFR | O | APPLICATION FILING RECEIPT MAILED | Loading... |
| Aug 21, 2025 | NWAP | I | NEW APPLICATION ENTERED | Loading... |
Detailed Classifications
Class 037
Earthworks services in the nature of excavating for building construction; Excavation services; Advisory services relating to excavating; Pipeline maintenance; Lining the interior of pipes for others by spraying on a fluid impervious barrier in the nature of a mixture of polyurethane and epoxy resin; Construction services, namely, manhole adjusting; Grouting services
First Use Anywhere:
Jan 31, 2025
First Use in Commerce:
Jan 31, 2025
Class 042
Pipeline inspection services; Design of pipelines; Locating and marking placement of underground utility pipes, cable or wires
First Use Anywhere:
Jan 31, 2025
First Use in Commerce:
Jan 31, 2025
Additional Information
Design Mark
The mark consists of three stylized droplet shapes arranged side by side. The first droplet on the left is shorter and rounded at the base, tapering to a point at the top. The middle droplet is taller and narrower, tapering to a sharp point. The droplet on the right is the tallest, with a pointed tip and a curved base that extends outward.
Classification
International Classes
037
042