Legal Representation
Attorney
Amy F. Divino
USPTO Deadlines
Application History
17 events| Date | Code | Type | Description | Documents |
|---|---|---|---|---|
| Dec 24, 2025 | NONP | E | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | Loading... |
| Dec 4, 2025 | CNSA | P | APPROVED FOR PUB - PRINCIPAL REGISTER | Loading... |
| Dec 4, 2025 | XAEC | I | EXAMINER'S AMENDMENT ENTERED | Loading... |
| Dec 4, 2025 | GNEN | O | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | Loading... |
| Dec 4, 2025 | GNEA | F | EXAMINERS AMENDMENT E-MAILED | Loading... |
| Dec 4, 2025 | CNEA | R | EXAMINERS AMENDMENT -WRITTEN | Loading... |
| Dec 3, 2025 | TEME | I | TEAS/EMAIL CORRESPONDENCE ENTERED | Loading... |
| Dec 3, 2025 | CRFA | I | CORRESPONDENCE RECEIVED IN LAW OFFICE | Loading... |
| Dec 3, 2025 | TROA | I | TEAS RESPONSE TO OFFICE ACTION RECEIVED | Loading... |
| Oct 5, 2025 | GNRN | O | NOTIFICATION OF NON-FINAL ACTION E-MAILED | Loading... |
| Oct 5, 2025 | GNRT | F | NON-FINAL ACTION E-MAILED | Loading... |
| Oct 5, 2025 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
| Sep 29, 2025 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
| Sep 24, 2025 | MDSC | E | NOTICE OF DESIGN SEARCH CODE E-MAILED | Loading... |
| Sep 24, 2025 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
| May 16, 2025 | MAFR | O | APPLICATION FILING RECEIPT MAILED | Loading... |
| May 16, 2025 | NWAP | I | NEW APPLICATION ENTERED | Loading... |
Detailed Classifications
Class 037
Building construction services; Construction, maintenance, rehabilitation and repair of tunnels and underground structures, airports, bridges, railroads, subway stations, roadways, marine facilities, utility facilities, water treatment and pollution control facilities, sewer and drainage systems, walls, and other public civil infrastructure; Construction consultation, management and supervision services; Deep foundation construction services; Temporary support of excavation and bracing being excavation services; Underpinning services being foundation contractor services; Soil and rock excavation services; Bridge rehabilitation services being construction and repair of bridges; Resilience services being infrastructure construction services of flood barriers, walls, gates and other defenses against storms and sea-level rise.
Additional Information
Design Mark
The mark consists of two interlocking triangles pointing towards the right. The left triangle is intersected by a diagonal band and the left edge of the right triangle.
Classification
International Classes
037