Legal Representation
Attorney
Mark A Oathout
USPTO Deadlines
Application History
11 events| Date | Code | Type | Description | Documents |
|---|---|---|---|---|
| Oct 28, 2025 | TEME | I | TEAS/EMAIL CORRESPONDENCE ENTERED | Loading... |
| Oct 28, 2025 | CRFA | I | CORRESPONDENCE RECEIVED IN LAW OFFICE | Loading... |
| Oct 28, 2025 | TROA | I | TEAS RESPONSE TO OFFICE ACTION RECEIVED | Loading... |
| Jul 29, 2025 | GNRN | O | NOTIFICATION OF NON-FINAL ACTION E-MAILED | Loading... |
| Jul 29, 2025 | GNRT | F | NON-FINAL ACTION E-MAILED | Loading... |
| Jul 29, 2025 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
| Jul 14, 2025 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
| Jul 13, 2025 | MDSC | E | NOTICE OF DESIGN SEARCH CODE E-MAILED | Loading... |
| Jul 13, 2025 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
| May 8, 2025 | MAFR | O | APPLICATION FILING RECEIPT MAILED | Loading... |
| May 8, 2025 | NWAP | I | NEW APPLICATION ENTERED | Loading... |
Detailed Classifications
Class 037
Horizontal directional drilling for installing power, communications, and cable lines; Construction management; Construction of overhead and underground electric power, communications, and cable infrastructure lines; Installation, maintenance and repair of overhead and underground electric power, communications, and cable infrastructure lines; Electrical contracting; Construction of electrical substations
First Use Anywhere:
May 31, 2022
First Use in Commerce:
May 31, 2022
Additional Information
Design Mark
The mark consists of a concentric circle design and within the concentric circles are stylized designs of a utility pole, utility lines, and electricity. The words "BAY LINE CONSTRUCTION" appear is a circular arc format generally below the utility pole design and within the concentric circles.
Classification
International Classes
037
Disclaimers
The following terms have been disclaimed and are not claimed as part of the trademark:
Specific Disclaimer
"LINE CONSTRUCTION"