Legal Representation
Attorney
Margaret A. Boulware
USPTO Deadlines
Next Deadline
28 days remaining
Notification of Non-Final Action E-Mailed
Due Date
December 08, 2025
Extension Available
Until March 08, 2026
Additional deadlines exist. Contact your attorney for complete deadline information.
Application History
8 events| Date | Code | Type | Description | Documents |
|---|---|---|---|---|
| Sep 8, 2025 | GNRN | O | NOTIFICATION OF NON-FINAL ACTION E-MAILED | Loading... |
| Sep 8, 2025 | GNRT | F | NON-FINAL ACTION E-MAILED | Loading... |
| Sep 8, 2025 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
| Aug 22, 2025 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
| Aug 10, 2025 | MDSC | E | NOTICE OF DESIGN SEARCH CODE E-MAILED | Loading... |
| Aug 10, 2025 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
| Mar 25, 2025 | MAFR | O | APPLICATION FILING RECEIPT MAILED | Loading... |
| Mar 25, 2025 | NWAP | I | NEW APPLICATION ENTERED | Loading... |
Detailed Classifications
Class 040
Generation of energy
Additional Information
Design Mark
The mark consists of a hexagon with long vertical sides and shorter and smooth angular sides, with a two triangular solid mountain shapes on the left, horizontal line with a small arc and a large arc connecting one end of the small arc extending to the right end of the vertical right side, an arc from right triangle of the mountain extending to right arc containing four vertical lines coming off from the arc with lens shape in between each vertical line, a curving line in the middle of the hexagon and the words BLUE BRIDGE SOLAR PARK under the curving line, three lens shapes at the bottom of 'SOLAR PARK' with two lens on each side of a center lens.
Classification
International Classes
040
Disclaimers
The following terms have been disclaimed and are not claimed as part of the trademark:
Specific Disclaimer
"SOLAR PARK"