Legal Representation
Attorney
Michael D. Fishman
USPTO Deadlines
Next Deadline
127 days remaining
NOA E-Mailed - SOU Required
Due Date
May 25, 2026
Extension Available
Until November 25, 2026
Application History
10 events| Date | Code | Type | Description | Documents |
|---|---|---|---|---|
| Nov 25, 2025 | NOAM | E | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | Loading... |
| Sep 30, 2025 | NPUB | E | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | Loading... |
| Sep 30, 2025 | PUBO | A | PUBLISHED FOR OPPOSITION | Loading... |
| Sep 24, 2025 | NONP | E | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | Loading... |
| Sep 3, 2025 | CNSA | P | APPROVED FOR PUB - PRINCIPAL REGISTER | Loading... |
| Aug 21, 2025 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
| Aug 8, 2025 | MDSC | E | NOTICE OF DESIGN SEARCH CODE E-MAILED | Loading... |
| Aug 8, 2025 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
| Mar 21, 2025 | MAFR | O | APPLICATION FILING RECEIPT MAILED | Loading... |
| Mar 21, 2025 | NWAP | I | NEW APPLICATION ENTERED | Loading... |
Detailed Classifications
Class 037
Building construction services; construction excavation services; construction of geothermal fields; drilling of geothermal fields; construction equipment installation, rigging, erecting; construction equipment repair and maintenance; installation, repair and maintenance of heating and cooling systems; consulting services in the fields of building construction and construction of geothermal fields; provision of information in the field of building construction and construction of geothermal fields
Additional Information
Design Mark
The mark consists of two leaves and two arrows within a circle.
Classification
International Classes
037