Legal Representation
Attorney
Michael J. Hickey
USPTO Deadlines
Next Deadline
69 days remaining
Notification of Non-Final Action E-Mailed
Due Date
September 15, 2025
Extension Available
Until December 15, 2025
Additional deadlines exist. Contact your attorney for complete deadline information.
Application History
8 eventsDate | Code | Type | Description |
---|---|---|---|
Jun 15, 2025 | GNRT | F | NON-FINAL ACTION E-MAILED |
Jun 15, 2025 | CNRT | R | NON-FINAL ACTION WRITTEN |
Jun 15, 2025 | GNRN | O | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
May 30, 2025 | DOCK | D | ASSIGNED TO EXAMINER |
May 21, 2025 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
May 21, 2025 | MDSM | E | NOTICE OF DESIGN SEARCH CODE E-MAILED |
Feb 25, 2025 | MAFR | O | APPLICATION FILING RECEIPT MAILED |
Feb 25, 2025 | NWAP | I | NEW APPLICATION ENTERED |
Detailed Classifications
Class 037
maintenance, repair, and rebuilding of heavy duty diesel engines, engine blocks, crankshafts, connecting rods, and adjuster heads; maintenance, repair, and rebuilding of diesel fuel injectors, pumps, and turbochargers; maintenance, repair, and rebuilding of powertrain components, transmissions, axles, and power takeoffs; maintenance, repair, and rebuilding of heavy equipment, namely construction equipment, agricultural equipment, industrial equipment, telehandlers, boom lifts, generators, material handlers, dewatering pumps, and aerial lifts
Additional Information
Design Mark
The mark consists of half of a gear design with a lightning bolt centered inside the open half of the gear design with the letters "RMPT" in bold stylized font to the right of the gear and lightning bolt design above the phrase "Rocky Mountain Powertrain" in bold stylized font.
Pseudo Mark
ROCKY MOUNTAIN POWER TRAIN ROCKY MOUNTAIN POWERTRAIN
Classification
International Classes
037