Legal Representation
Attorney
Vivian Ortiz-Ponce
USPTO Deadlines
Next Deadline
183 days remaining
NOA E-Mailed - SOU Required
Due Date
January 22, 2026
Extension Available
Until July 22, 2026
Application History
20 eventsDate | Code | Type | Description | Documents |
---|---|---|---|---|
Jul 22, 2025 | NOAM | E | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | Loading... |
May 27, 2025 | NPUB | E | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | Loading... |
May 27, 2025 | PUBO | A | PUBLISHED FOR OPPOSITION | Loading... |
May 21, 2025 | NONP | E | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | Loading... |
Apr 28, 2025 | CNSA | P | APPROVED FOR PUB - PRINCIPAL REGISTER | Loading... |
Apr 28, 2025 | XAEC | I | EXAMINER'S AMENDMENT ENTERED | Loading... |
Apr 28, 2025 | CNEA | R | EXAMINERS AMENDMENT -WRITTEN | Loading... |
Apr 28, 2025 | GNEA | F | EXAMINERS AMENDMENT E-MAILED | Loading... |
Apr 28, 2025 | GNEN | O | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | Loading... |
Apr 12, 2025 | TEME | I | TEAS/EMAIL CORRESPONDENCE ENTERED | Loading... |
Apr 12, 2025 | TROA | I | TEAS RESPONSE TO OFFICE ACTION RECEIVED | Loading... |
Apr 12, 2025 | CRFA | I | CORRESPONDENCE RECEIVED IN LAW OFFICE | Loading... |
Mar 22, 2025 | GNRN | O | NOTIFICATION OF NON-FINAL ACTION E-MAILED | Loading... |
Mar 22, 2025 | GNRT | F | NON-FINAL ACTION E-MAILED | Loading... |
Mar 22, 2025 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
Mar 19, 2025 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
Mar 18, 2025 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
Mar 18, 2025 | MDSC | E | NOTICE OF DESIGN SEARCH CODE E-MAILED | Loading... |
Feb 6, 2025 | MAFR | O | APPLICATION FILING RECEIPT MAILED | Loading... |
Feb 6, 2025 | NWAP | I | NEW APPLICATION ENTERED | Loading... |
Detailed Classifications
Class 040
Waste treatment and processing; Metal treating; Providing information relating to material treatment; Metal casting; Refining services of metals; Treatment of hazardous liquids; Heat treatment of metals; Stone grinding for mining; Recycling of chemicals; waste recycling and waste treatment; Material processing, namely, obtaining ore by means of obtaining metal from metallic ores, native metallic ores, processed metallic ores and from metal-containing waste; Material processing, namely, obtaining metals from native earth materials; Treatment of common metal materials; Treatment and processing of ores and ore concentrates; Treatment and processing of materials in the nature of metallic ores, native metallic ores, processes metallic ores, metal-containing waste, metal alloys, metals from minerals, and articles made wholly, or substantially from metals by means of hydrometallurgical processing
Additional Information
Design Mark
The mark consists of a drawing comprised of a line forming an angle followed by a vertical line featuring two smaller diagonal lines connected to its left side, a vertical line featuring two smaller diagonal lines connected to its right side, and another line that forms an angle, to the right appears the wording "CEIBO" in stylized letters.
Translation
CEIBO has no meaning in a foreign language.
Classification
International Classes
040