Legal Representation
Attorney
Dyan M. House
USPTO Deadlines
Next Deadline
64 days remaining
Non-Final Action Mailed
Due Date
October 01, 2025
Extension Available
Until January 01, 2026
Additional deadlines exist. Contact your attorney for complete deadline information.
Application History
6 eventsDate | Code | Type | Description | Documents |
---|---|---|---|---|
Jul 1, 2025 | GNRT | F | NON-FINAL ACTION E-MAILED | Loading... |
Jul 1, 2025 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
Jul 1, 2025 | GNRN | O | NOTIFICATION OF NON-FINAL ACTION E-MAILED | Loading... |
Jun 5, 2025 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
Apr 28, 2025 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
Dec 19, 2024 | NWAP | I | NEW APPLICATION ENTERED | Loading... |
Detailed Classifications
Class 009
Insulating and switching gas for high voltage electrical transmission equipment; Electrical power instrument transformers; Fiber optic cables; Gas insulated electrical substations; Gas insulated electrical switchgear panels and switchgear controls; Electrical voltage and electrical current measurement devices; Gas monitoring devices, including multiple gas transformer dissolved gas analysis (DGA) devices; Low power instrument transformers; Circuit breakers, fuses and switches, namely, circuit protection devices, to protect, control and isolate electrical equipment
Class 037
Lifecycle assessment services for electrical grid equipment and services; Power transformer oil recycling services; Electrical grid repair and retrofitting services
Classification
International Classes
009
037