Legal Representation
Attorney
Brad R. Maurer
USPTO Deadlines
Next Deadline
49 days remaining
Non-Final Action Mailed
Due Date
September 05, 2025
Extension Available
Until December 05, 2025
Additional deadlines exist. Contact your attorney for complete deadline information.
Application History
7 eventsDate | Code | Type | Description | Documents |
---|---|---|---|---|
Jun 5, 2025 | GNRN | O | NOTIFICATION OF NON-FINAL ACTION E-MAILED | Loading... |
Jun 5, 2025 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
Jun 5, 2025 | GNRT | F | NON-FINAL ACTION E-MAILED | Loading... |
Jun 4, 2025 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
May 26, 2025 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
May 26, 2025 | MDSC | E | NOTICE OF DESIGN SEARCH CODE E-MAILED | Loading... |
Dec 18, 2024 | NWAP | I | NEW APPLICATION ENTERED | Loading... |
Detailed Classifications
Class 006
cladding of metal for construction and building; soffits made of metal; battens made of metal; fencing made of metal; screens made of metal with components including battens, slats, and posts; railings made of metal; gates made of metal; enclosures made of metal, enclosures made of metal for HVAC, refuse, recycling, and other facility maintenance and operation purposes; pergolas primarily of metal, pergolas being structures of metal for outdoor premises
First Use Anywhere:
20210100
First Use in Commerce:
20210100
Additional Information
Design Mark
The mark consists of two black line segments joined at the top to form a sixty degree angle, a grey line segment running below, parallel to and extending slightly beyond the base of the left black line segment, and a blue line segment running below and parallel to the grey line segment that crosses and extends a short distance beyond the right black line segment.
Color Claim
The color(s) black, grey and blue is/are claimed as a feature of the mark.
Classification
International Classes
006