Legal Representation
Attorney
Jay Schloff
USPTO Deadlines
Next Deadline
2168 days remaining
Section 8 Declaration Due (Principal Register) (Based on registration date 20251125)
Due Date
November 25, 2031
Grace Period Ends
May 25, 2032
Additional deadlines exist. Contact your attorney for complete deadline information.
Application History
18 events| Date | Code | Type | Description | Documents |
|---|---|---|---|---|
| Nov 25, 2025 | NRCC | E | NOTICE OF REGISTRATION CONFIRMATION EMAILED | Loading... |
| Nov 25, 2025 | R.PR | A | REGISTERED-PRINCIPAL REGISTER | Loading... |
| Oct 7, 2025 | NPUB | E | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | Loading... |
| Oct 7, 2025 | PUBO | A | PUBLISHED FOR OPPOSITION | Loading... |
| Oct 1, 2025 | NONP | E | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | Loading... |
| Sep 9, 2025 | CNSA | O | APPROVED FOR PUB - PRINCIPAL REGISTER | Loading... |
| Sep 8, 2025 | TEME | I | TEAS/EMAIL CORRESPONDENCE ENTERED | Loading... |
| Sep 8, 2025 | CRFA | I | CORRESPONDENCE RECEIVED IN LAW OFFICE | Loading... |
| Sep 8, 2025 | TROA | I | TEAS RESPONSE TO OFFICE ACTION RECEIVED | Loading... |
| Aug 15, 2025 | XELG | O | APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED | Loading... |
| Aug 15, 2025 | XELR | I | APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED | Loading... |
| May 15, 2025 | GNRN | O | NOTIFICATION OF NON-FINAL ACTION E-MAILED | Loading... |
| May 15, 2025 | GNRT | F | NON-FINAL ACTION E-MAILED | Loading... |
| May 15, 2025 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
| May 15, 2025 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
| May 12, 2025 | MDSC | E | NOTICE OF DESIGN SEARCH CODE E-MAILED | Loading... |
| May 12, 2025 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
| Nov 22, 2024 | NWAP | I | NEW APPLICATION ENTERED | Loading... |
Detailed Classifications
Class 037
Building inspection in the course of building construction; Inspection services in the course of construction of utilities and infrastructure; Building construction observation, namely, static inspection, functional verification inspection, performance verification inspection
First Use Anywhere:
Feb 1, 2024
First Use in Commerce:
Feb 1, 2024
Class 042
Construction engineering; construction materials testing; conducting non-destructive testing on civil engineering; geophysical assessments and subsurface evaluation; Electronic monitoring and reporting of ground vibrations using computers or sensors; real-time monitoring of temporary structures, utilities and railroads to ensure proper functioning; specialized laboratory testing of aggregate, soil and other building materials; Design of information graphics and data visualization materials of engineering and property data actual and proposed; Compiling and analyzing of client and third-party data for mapping, engineering and land surveying purposes; Inspection of building materials for quality control purposes
First Use Anywhere:
Feb 1, 2024
First Use in Commerce:
Feb 1, 2024
Additional Information
Design Mark
The mark consists of the letters "SME" in a gray stylized font, and a swirl figure disposed to the left of the letters, the swirl figure comprised of blue, orange and red. The color white represents background and is not claimed as a feature of the mark.
Color Claim
The color(s) red, orange, blue and gray is/are claimed as a feature of the mark.
Classification
International Classes
037
042