Legal Representation
Attorney
Cami Boyd
USPTO Deadlines
Next Deadline
2098 days remaining
Section 8 Declaration Due (Principal Register) (Based on registration date 20250923)
Due Date
September 23, 2031
Grace Period Ends
March 23, 2032
Additional deadlines exist. Contact your attorney for complete deadline information.
Application History
16 events| Date | Code | Type | Description | Documents |
|---|---|---|---|---|
| Sep 23, 2025 | NRCC | E | NOTICE OF REGISTRATION CONFIRMATION EMAILED | Loading... |
| Sep 23, 2025 | R.PR | A | REGISTERED-PRINCIPAL REGISTER | Loading... |
| Aug 5, 2025 | NPUB | E | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | Loading... |
| Aug 5, 2025 | PUBO | A | PUBLISHED FOR OPPOSITION | Loading... |
| Jul 30, 2025 | NONP | E | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | Loading... |
| Jul 1, 2025 | CNSA | O | APPROVED FOR PUB - PRINCIPAL REGISTER | Loading... |
| Jun 17, 2025 | TEME | I | TEAS/EMAIL CORRESPONDENCE ENTERED | Loading... |
| Jun 17, 2025 | CRFA | I | CORRESPONDENCE RECEIVED IN LAW OFFICE | Loading... |
| Jun 17, 2025 | TROA | I | TEAS RESPONSE TO OFFICE ACTION RECEIVED | Loading... |
| Mar 18, 2025 | GNRN | O | NOTIFICATION OF NON-FINAL ACTION E-MAILED | Loading... |
| Mar 18, 2025 | GNRT | F | NON-FINAL ACTION E-MAILED | Loading... |
| Mar 18, 2025 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
| Mar 13, 2025 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
| Mar 12, 2025 | MDSM | E | NOTICE OF DESIGN SEARCH CODE E-MAILED | Loading... |
| Mar 12, 2025 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
| Aug 30, 2024 | NWAP | I | NEW APPLICATION ENTERED | Loading... |
Detailed Classifications
Class 037
Rental of construction and building equipment in the nature of scaffolding, scaffolding accessories and parts for scaffolding, scaffold framing and guardrails, building and working platforms and towers, scaffold planks, wallboards, portable flooring and decking, scaffold platforms and towers, scaffold stairs, wall braces, and construction equipment and materials in the nature of forklift man baskets, power poles, quick headers, trash hoppers, and winches; Rental of construction equipment in the nature of forklift man baskets, winches, and shoring frames and accessories; Installation of building scaffolding and building and working platforms and decking; Erection of scaffolding equipment
First Use Anywhere:
Mar 1, 2022
First Use in Commerce:
Mar 1, 2022
Additional Information
Design Mark
The mark consists of a gable style rooftop silhouette, the left side of which rooftop appears in a darker orange color and the right side of which rooftop appears in a lighter orange color. Underneath the rooftop appears the word "SOUTHWEST". The "SOUTH" portion of "SOUTHWEST" appears in the same darker orange color as the left side of the rooftop. The "WEST" portion of "SOUTHWEST" appears in the same lighter orange color as the right side of the rooftop. All of the letters in "SOUTHWEST" are outlined in black. Underneath the word "SOUTHWEST" appear the words "SCAFFOLDING" and "SUPPLY" in black, separated by an orange plus symbol.
Color Claim
The color(s) orange and black is/are claimed as a feature of the mark.
Pseudo Mark
SOUTHWEST SCAFFOLDING PLUS SUPPLY
Pseudo Mark
SOUTHWEST SCAFFOLDING AND SUPPLY
Classification
International Classes
037
Disclaimers
The following terms have been disclaimed and are not claimed as part of the trademark:
Specific Disclaimer
"SOUTHWEST SCAFFOLDING + SUPPLY"