Legal Representation
Attorney
Alexander R. Kuszewski
USPTO Deadlines
Application History
8 events| Date | Code | Type | Description | Documents |
|---|---|---|---|---|
| Jul 13, 2025 | MAB2 | E | ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND | Loading... |
| Jul 13, 2025 | ABN2 | O | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | Loading... |
| Feb 27, 2025 | GNRN | O | NOTIFICATION OF NON-FINAL ACTION E-MAILED | Loading... |
| Feb 27, 2025 | GNRT | F | NON-FINAL ACTION E-MAILED | Loading... |
| Feb 27, 2025 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
| Feb 13, 2025 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
| Feb 12, 2025 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
| Jul 26, 2024 | NWAP | I | NEW APPLICATION ENTERED | Loading... |
Detailed Classifications
Class 042
Engineering and engineering consulting services in the fields of information technology, automation, manufacturing, enterprise integration, EMI (enterprise manufacturing intelligence), EAI (enterprise application integration), and electronic business, namely, PLC (programmable logic controllers)/DCS (distributed control system) development and replacement; front-end engineering services; engineering project management; technological consulting services in the field of energy optimization, manufacturing plant documentation for operations, engineering, DCS (distributed control system)/HMI (human-machine interface) specification development and configuration; piping and instrumentation diagram development; piping and instrumentation design and development, process control functional description and specification development, detailed electrical instrumentation design, electrical instrument specification; medium-and low-voltage power distribution system design and implementation, hardwired safety interlock design, software safety interlock design, electrical heat trace design, electrical control cabinet construction, control cabinet design and layout, network design and layout, computer networking and system architecture design and implementation; Internet, intranet and extranet website design and development; custom database design and configuration; preparing engineering compliance reports; engineering consulting services, namely, technician calibration, outage services and planning, advanced process control solutions, demand planning, production planning and scheduling, logistics and distribution, manufacturing execution/production management, manufacturing intelligence, quality management, system health checks, product update monitoring, subsystem communication, system simulation; Remote monitoring in the field of industrial process controls systems, namely, PLC (programmable logic controllers), DCS (distributed control systems), and HMI (human machine interface) systems; Technical support services, namely, troubleshooting of industrial process control computer software problems; Maintenance of software used in PLC, DCS and HMI industrial process control systems; Providing engineering and engineering consulting services remotely in the fields of information technology, automation, manufacturing, and enterprise integration; remote computer network technical monitoring, software maintenance services, and data recovery services
First Use Anywhere:
Sep 17, 2012
First Use in Commerce:
Sep 17, 2012
Additional Information
Pseudo Mark
PLANTFLOOR TWO FOUR
Pseudo Mark
PLANTFLOOR TWENTY FOUR
Pseudo Mark
PLANT FOUR TWO FOUR
Pseudo Mark
PLANT FLOOR TWENTY FOUR
Classification
International Classes
042