Legal Representation
Attorney
Michael Springer
USPTO Deadlines
Next Deadline
2106 days remaining
Section 8 (6-Year) Declaration Due (Based on registration date 2025-04-29)
Due Date
April 29, 2031
Grace Period Ends
October 29, 2031
Additional deadlines exist. Contact your attorney for complete deadline information.
Application History
14 eventsDate | Code | Type | Description | Documents |
---|---|---|---|---|
Apr 29, 2025 | NRCC | E | NOTICE OF REGISTRATION CONFIRMATION EMAILED | Loading... |
Apr 29, 2025 | R.PR | A | REGISTERED-PRINCIPAL REGISTER | Loading... |
Mar 11, 2025 | NPUB | E | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | Loading... |
Mar 11, 2025 | PUBO | A | PUBLISHED FOR OPPOSITION | Loading... |
Mar 5, 2025 | NONP | E | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | Loading... |
Feb 14, 2025 | CNSA | O | APPROVED FOR PUB - PRINCIPAL REGISTER | Loading... |
Feb 14, 2025 | XAEC | I | EXAMINER'S AMENDMENT ENTERED | Loading... |
Feb 14, 2025 | GNEA | F | EXAMINERS AMENDMENT E-MAILED | Loading... |
Feb 14, 2025 | CNEA | R | EXAMINERS AMENDMENT -WRITTEN | Loading... |
Feb 14, 2025 | GNEN | O | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | Loading... |
Feb 11, 2025 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
Feb 10, 2025 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
Feb 10, 2025 | MDSC | E | NOTICE OF DESIGN SEARCH CODE E-MAILED | Loading... |
Jul 23, 2024 | NWAP | I | NEW APPLICATION ENTERED | Loading... |
Detailed Classifications
Class 037
general construction contracting services in the field of home improvement; excavation services for flood prevention, flood control, water diversion and protection; basement waterproofing services; installation and repair of flood protection equipment and flood protection fixtures and structures, namely drains, gutters, downspouts, dry wells, catch basins, and drainage ditches; installation of stormwater drains; installation and maintenance of sprinklers and irrigation systems for landscaping purposes; excavation services; providing consulting services to third parties in the fields of excavation and construction for flood prevention, flood control, water diversion and protection; construction, installation and repair of masonry walls and patios, walkways, steps, walls, flatwork, pavers, retaining walls, drains, fountains, sidewalks and driveways; masonry services; installation and repair of patios, walkways, steps, walls, flatwork, pavers, retaining walls, and driveways; landscape installation services in the nature of construction and installation of landscape structures and fixtures, namely patios, walkways, steps, walls, flatwork, pavers, planters retaining walls, drains, fountains, sidewalks, fences, drains, drainage ditches, and driveways; consulting services in the field of installation and repair of floodproofing and flood protection structures for commercial and residential buildings
First Use Anywhere:
Jan 18, 2019
First Use in Commerce:
Jan 18, 2019
Class 044
landscape design; consultancy in the field of landscape architecture; landscape architecture; lawn mowing; lawn, plant and tree care; planting of plants, trees, bushes, shrubs, vines, annuals, groundcover, and sod; landscape build services, namely, landscape gardening and design services; providing consulting services to third parties in the fields of landscape design featuring flood prevention, flood control, water diversion and protection; landscape design featuring flood prevention, flood control, water diversion and protection; landscape design consulting services in the field of floodproofing and flood protection for commercial and residential buildings
First Use Anywhere:
Jan 18, 2019
First Use in Commerce:
Jan 18, 2019
Additional Information
Design Mark
The mark consists of the words "FIELD FORM " in lower case letters with two stems, each with one leaf, separating the words.
Color Claim
Color is not claimed as a feature of the mark.
Classification
International Classes
037
044