Legal Representation
Attorney
Gwenn Roos
USPTO Deadlines
Next Deadline
29 days remaining
Final Refusal E-Mailed
Due Date
September 05, 2025
Extension Available
Until December 05, 2025
Application History
18 eventsDate | Code | Type | Description | Documents |
---|---|---|---|---|
Jun 5, 2025 | GNFR | O | FINAL REFUSAL E-MAILED | Loading... |
Jun 5, 2025 | GNFN | O | NOTIFICATION OF FINAL REFUSAL EMAILED | Loading... |
Jun 5, 2025 | CNFR | R | FINAL REFUSAL WRITTEN | Loading... |
Apr 30, 2025 | ABN2 | O | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | Loading... |
Apr 30, 2025 | MAB2 | E | ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND | Loading... |
Apr 30, 2025 | TEME | I | TEAS/EMAIL CORRESPONDENCE ENTERED | Loading... |
Apr 30, 2025 | TROA | I | TEAS RESPONSE TO OFFICE ACTION RECEIVED | Loading... |
Apr 30, 2025 | PETG | O | PETITION TO REVIVE-GRANTED | Loading... |
Apr 30, 2025 | PROA | I | TEAS PETITION TO REVIVE RECEIVED | Loading... |
Apr 30, 2025 | CRFA | I | CORRESPONDENCE RECEIVED IN LAW OFFICE | Loading... |
Apr 30, 2025 | NREV | E | NOTICE OF REVIVAL - E-MAILED | Loading... |
Jan 14, 2025 | GNRN | O | NOTIFICATION OF NON-FINAL ACTION E-MAILED | Loading... |
Jan 14, 2025 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
Jan 14, 2025 | GNRT | F | NON-FINAL ACTION E-MAILED | Loading... |
Jan 13, 2025 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
Jan 12, 2025 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
Jan 12, 2025 | MDSC | E | NOTICE OF DESIGN SEARCH CODE E-MAILED | Loading... |
Jun 20, 2024 | NWAP | I | NEW APPLICATION ENTERED | Loading... |
Detailed Classifications
Class 042
Engineering design services; Engineering design services in the field of dry dock facilities; Engineering drawing services; Engineering services, namely, engineering for the dry dock facilities; Engineering surveying; Marine engineering; Marine surveying services; Marine, aerial and land surveying; Planning and design of dry dock facilities; Planning and layout design services for dry dock facilities; Planning of buildings and infrastructure systems for buildings; Conducting engineering surveys; Consulting in the field of structural engineering; Consulting in the field of dry dock facility and related component engineering; Custom design and engineering of dry dock facilities; Drafting of plans and engineering drawings for others; Hydraulic engineering and design; Hydrologic engineering services; Mechanical engineering; Structural engineering design services; Surveying and engineering; Technological planning and consulting services in the field of dry docks; dry dock facility engineering
First Use Anywhere:
Oct 24, 2023
First Use in Commerce:
Oct 24, 2023
Additional Information
Design Mark
The mark consists of an anchor with the word TRITON across the middle.
Color Claim
Color is not claimed as a feature of the mark.
Classification
International Classes
042