Legal Representation
Attorney
Macayla Nicolaison, Esq.
USPTO Deadlines
Next Deadline
1918 days remaining
Section 8 Declaration Due (Principal Register) (Based on registration date 20250318)
Due Date
March 18, 2031
Grace Period Ends
September 18, 2031
Additional deadlines exist. Contact your attorney for complete deadline information.
Application History
10 events| Date | Code | Type | Description | Documents |
|---|---|---|---|---|
| Mar 18, 2025 | NRCC | E | NOTICE OF REGISTRATION CONFIRMATION EMAILED | Loading... |
| Mar 18, 2025 | R.PR | A | REGISTERED-PRINCIPAL REGISTER | Loading... |
| Jan 28, 2025 | NPUB | E | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | Loading... |
| Jan 28, 2025 | PUBO | A | PUBLISHED FOR OPPOSITION | Loading... |
| Jan 22, 2025 | NONP | E | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | Loading... |
| Jan 4, 2025 | CNSA | O | APPROVED FOR PUB - PRINCIPAL REGISTER | Loading... |
| Dec 31, 2024 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
| Dec 30, 2024 | MDSM | E | NOTICE OF DESIGN SEARCH CODE E-MAILED | Loading... |
| Dec 30, 2024 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
| Jun 11, 2024 | NWAP | I | NEW APPLICATION ENTERED | Loading... |
Detailed Classifications
Class 037
Air conditioning vent sealing services; Installation of rain gutters; Installation of roof gutters; Installation of ventilating apparatus; Roofing contracting; Roofing repair; Roofing services; Environmental containment, namely, localization, drying and cleaning of particulate and moisture contaminants for buildings and contents therein; Installation and replacement service for heating, ventilating and air conditioning systems; Installation of cavity wall insulation; Installation of heating, ventilation and air-conditioning systems; Installation of heating, refrigerating, air-conditioning, drying, ventilating and dust extraction apparatus; Installation of thermal insulation for buildings; Installation, maintenance and repair of ventilating apparatus; Installation, maintenance and repair of ventilating systems; Installation, maintenance and repair of automatic apparatus for opening and closing ventilation flaps; Installation, maintenance and repair of automatic apparatus for opening and closing windows, fanlights, skylights and ventilation flaps; Installation, maintenance and repair of mechanically operated apparatus for opening and closing ventilation flaps; Installation, maintenance and repair of mechanically operated apparatus for opening and closing windows, fanlights, skylights and ventilation flaps; Providing information in the field of home renovations and repairs; Repair and maintenance of heating, refrigerating, air-conditioning, drying, ventilating and dust extraction apparatus; Roofing installation
First Use Anywhere:
Jun 6, 2014
First Use in Commerce:
Jun 6, 2014
Additional Information
Design Mark
The mark consists of a logo designed from the uppercase English letter "Z". The letter "Z" is divided into four geometric shapes. The upper left corner is a red triangle, and the lower right corner is a black triangle, with a black parallelogram followed by a small red parallelogram in the middle. In the body of the black parallelogram is the words in red script "FROM THE ROOFTOP TO THE CRAWL, ONE CALL!".
Color Claim
The color(s) red and black is/are claimed as a feature of the mark.
Pseudo Mark
ZHE
Classification
International Classes
037