Legal Representation
Attorney
Mark A. Oathout
USPTO Deadlines
Next Deadline
1985 days remaining
Section 8 (6-Year) Declaration Due (Based on registration date 2025-04-08)
Due Date
April 08, 2031
Grace Period Ends
October 08, 2031
Additional deadlines exist. Contact your attorney for complete deadline information.
Application History
16 events| Date | Code | Type | Description | Documents |
|---|---|---|---|---|
| Apr 8, 2025 | NRCC | E | NOTICE OF REGISTRATION CONFIRMATION EMAILED | Loading... |
| Apr 8, 2025 | R.PR | A | REGISTERED-PRINCIPAL REGISTER | Loading... |
| Feb 18, 2025 | NPUB | E | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | Loading... |
| Feb 18, 2025 | PUBO | A | PUBLISHED FOR OPPOSITION | Loading... |
| Feb 12, 2025 | NONP | E | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | Loading... |
| Jan 29, 2025 | CNSA | O | APPROVED FOR PUB - PRINCIPAL REGISTER | Loading... |
| Jan 3, 2025 | TROA | I | TEAS RESPONSE TO OFFICE ACTION RECEIVED | Loading... |
| Jan 3, 2025 | TEME | I | TEAS/EMAIL CORRESPONDENCE ENTERED | Loading... |
| Jan 3, 2025 | CRFA | I | CORRESPONDENCE RECEIVED IN LAW OFFICE | Loading... |
| Oct 15, 2024 | GNRN | O | NOTIFICATION OF NON-FINAL ACTION E-MAILED | Loading... |
| Oct 15, 2024 | GNRT | F | NON-FINAL ACTION E-MAILED | Loading... |
| Oct 15, 2024 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
| Oct 9, 2024 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
| Sep 30, 2024 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
| Sep 30, 2024 | MDSC | E | NOTICE OF DESIGN SEARCH CODE E-MAILED | Loading... |
| Apr 16, 2024 | NWAP | I | NEW APPLICATION ENTERED | Loading... |
Detailed Classifications
Class 037
Construction of electric power infrastructure facilities, electrical transmission and distribution systems, SCADA and control systems, substations, renewable and clean energy infrastructure facilities and apparatus, and battery energy storage systems; Electrical contracting; Installation, maintenance and repair of electric power infrastructure facilities, electrical transmission and distribution systems, SCADA and control systems, substations, renewable and clean energy infrastructure facilities and apparatus, and battery energy storage systems
First Use Anywhere:
Mar 29, 2013
First Use in Commerce:
Mar 29, 2013
Class 042
Electronic and electrical systems design services; Engineering services in the field of electric power infrastructure facilities, electrical transmission and distribution systems, SCADA and control systems, substations, renewable and clean energy infrastructure facilities and apparatus, and battery energy storage systems
First Use Anywhere:
Dec 31, 2016
First Use in Commerce:
Dec 31, 2016
Additional Information
Design Mark
The mark consists of the stylized word "RYAN" wherein each letter appears within a rectangle design.
Color Claim
Color is not claimed as a feature of the mark.
Other
The mark was first used anywhere in a different form other than that sought to be registered at least as early as 12/31/1984.
Other
The mark was first used in commerce in a different form other than that sought to be registered at least as early as 12/31/1984.
Other
The mark was first used anywhere in a different form other than that sought to be registered at least as early as 12/31/1984.
Other
The mark was first used in commerce in a different form other than that sought to be registered at least as early as 12/31/1984.
Classification
International Classes
037
042