Legal Representation
Attorney
Brian Edward Banner
USPTO Deadlines
Next Deadline
167 days remaining
Statement of Use Due - Extension 1 Granted
Due Date
January 14, 2026
Extension Available
Until January 14, 2026
Application History
19 eventsDate | Code | Type | Description | Documents |
---|---|---|---|---|
Jun 24, 2025 | EXRA | E | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | Loading... |
Jun 23, 2025 | EX1G | S | SOU EXTENSION 1 GRANTED | Loading... |
Jun 23, 2025 | EXT1 | S | SOU EXTENSION 1 FILED | Loading... |
Jun 23, 2025 | EEXT | I | SOU TEAS EXTENSION RECEIVED | Loading... |
Jan 14, 2025 | NOAM | E | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | Loading... |
Dec 3, 2024 | NPUB | E | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | Loading... |
Dec 3, 2024 | PUBO | A | PUBLISHED FOR OPPOSITION | Loading... |
Nov 27, 2024 | NONP | E | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | Loading... |
Nov 6, 2024 | TEME | I | TEAS/EMAIL CORRESPONDENCE ENTERED | Loading... |
Nov 6, 2024 | CNSA | P | APPROVED FOR PUB - PRINCIPAL REGISTER | Loading... |
Nov 6, 2024 | TROA | I | TEAS RESPONSE TO OFFICE ACTION RECEIVED | Loading... |
Nov 6, 2024 | CRFA | I | CORRESPONDENCE RECEIVED IN LAW OFFICE | Loading... |
Sep 3, 2024 | GNRT | F | NON-FINAL ACTION E-MAILED | Loading... |
Sep 3, 2024 | GNRN | O | NOTIFICATION OF NON-FINAL ACTION E-MAILED | Loading... |
Sep 3, 2024 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
Aug 29, 2024 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
Jun 3, 2024 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
Jun 3, 2024 | MDSC | E | NOTICE OF DESIGN SEARCH CODE E-MAILED | Loading... |
Mar 29, 2024 | NWAP | I | NEW APPLICATION ENTERED | Loading... |
Detailed Classifications
Class 009
Downloadable computer software and firmware for downloading and organizing architectural files relating to remote building inspections, and for conducting building inspections, and organizing a buildings regulatory framework, and arranging for a comparison between a building under construction and local code requirements and for scheduling and monitoring such remote inspections in the field of building code compliance.
Additional Information
Design Mark
The mark consists of an eye-shaped design with smooth contours resembling a human eye. Within the eye shape are the representations of three buildings, aligned in a horizontal row, left to right. The first building is rectangular in shape, with a shed roof sloping downwards to the right. The second building is the tallest of the three and has a gable shaped roof to depict a 3-dimensional look. The third building has a vertical rectangle shape. The overall composition is enclosed within a circular border. Below this eye icon is the text "IRIS" written in capital letters.
Color Claim
Color is not claimed as a feature of the mark.
Classification
International Classes
009