Legal Representation
Attorney
Kit M. Stetina
USPTO Deadlines
Application History
9 eventsDate | Code | Type | Description |
---|---|---|---|
Oct 23, 2024 | ABN2 | O | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE |
Oct 23, 2024 | MAB2 | E | ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND |
Jul 9, 2024 | GNRN | O | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Jul 9, 2024 | CNRT | R | NON-FINAL ACTION WRITTEN |
Jul 9, 2024 | GNRT | F | NON-FINAL ACTION E-MAILED |
Jul 2, 2024 | DOCK | D | ASSIGNED TO EXAMINER |
Mar 1, 2024 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Mar 1, 2024 | MDSC | E | NOTICE OF DESIGN SEARCH CODE E-MAILED |
Dec 5, 2023 | NWAP | I | NEW APPLICATION ENTERED |
Detailed Classifications
Class 037
Installation of gas supply and distribution apparatus; installation of drying apparatus; installation and maintenance of air sterilizers; installation/maintenance and repair of air cooling heat exchangers; repair of air filters and parts thereof; installation of air purifiers; repair or maintenance of industrial washing machines; installation and repair of water filtering apparatus; installation of oxidation apparatus for water purifying; installation, maintenance and repair of exhaust gas reduction systems.
Additional Information
Design Mark
The mark consists of the stylized text ECOFLOW, with the letters E and F being capitalized. A ring figure design is around the letter E. The ring figure is green, and the letters are blue.
Color Claim
The color(s) green and blue is/are claimed as a feature of the mark.
Classification
International Classes
037