SPRUNG STRUCTURES BUILD FASTER

Serial Number 98092285
653

Registration Progress

Application Filed
Jul 19, 2023
Under Examination
Approved for Publication
Published for Opposition
Registered

Trademark Image

SPRUNG STRUCTURES BUILD FASTER

Basic Information

Serial Number
98092285
Filing Date
July 19, 2023
Drawing Code
3

Status Summary

Current Status
Active
Status Code
653
Status Date
May 20, 2025
Application
Pending
Classes
019 042

Rights Holder

Sprung Instant Structures Ltd.

03
Address
80039 Maple Leaf Road
Aldersyde, Alberta T0L0A0
CA

Ownership History

Sprung Instant Structures Ltd.

Original Applicant
03
Aldersyde, Alberta CA

Legal Representation

Attorney
Molly Mack Crandall

USPTO Deadlines

All Deadlines Cleared

All 3 deadline(s) have been cleared by subsequent events. No active deadlines at this time.

Application History

24 events
Date Code Type Description Documents
May 20, 2025 GNS3 O NOTIFICATION OF LETTER OF SUSPENSION E-MAILED Loading...
May 20, 2025 CNSL R SUSPENSION LETTER WRITTEN Loading...
May 20, 2025 GNSL F LETTER OF SUSPENSION E-MAILED Loading...
May 20, 2025 TEME I TEAS/EMAIL CORRESPONDENCE ENTERED Loading...
May 20, 2025 ALIE A ASSIGNED TO LIE Loading...
May 20, 2025 CRFA I CORRESPONDENCE RECEIVED IN LAW OFFICE Loading...
May 5, 2025 ERSI I TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED Loading...
Feb 11, 2025 CNSI R SUSPENSION INQUIRY WRITTEN Loading...
Feb 11, 2025 GNSI S INQUIRY TO SUSPENSION E-MAILED Loading...
Feb 11, 2025 GNS2 O NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED Loading...
Feb 7, 2025 RCCK S SUSPENSION CHECKED - TO ATTORNEY FOR ACTION Loading...
Jul 3, 2024 GNS3 O NOTIFICATION OF LETTER OF SUSPENSION E-MAILED Loading...
Jul 3, 2024 GNSL F LETTER OF SUSPENSION E-MAILED Loading...
Jul 3, 2024 CNSL R SUSPENSION LETTER WRITTEN Loading...
Jun 21, 2024 CRFA I CORRESPONDENCE RECEIVED IN LAW OFFICE Loading...
Jun 21, 2024 TROA I TEAS RESPONSE TO OFFICE ACTION RECEIVED Loading...
Jun 21, 2024 TEME I TEAS/EMAIL CORRESPONDENCE ENTERED Loading...
Mar 27, 2024 GNRN O NOTIFICATION OF NON-FINAL ACTION E-MAILED Loading...
Mar 27, 2024 GNRT F NON-FINAL ACTION E-MAILED Loading...
Mar 27, 2024 CNRT R NON-FINAL ACTION WRITTEN Loading...
Mar 25, 2024 DOCK D ASSIGNED TO EXAMINER Loading...
Aug 18, 2023 MDSC E NOTICE OF DESIGN SEARCH CODE E-MAILED Loading...
Aug 17, 2023 NWOS I NEW APPLICATION OFFICE SUPPLIED DATA ENTERED Loading...
Jul 22, 2023 NWAP I NEW APPLICATION ENTERED Loading...

Detailed Classifications

Class 019
Prefabricated frame supported stressed membrane buildings not made primarily of metal
Class 042
Custom designing, engineering, and fabricating of parts for stressed membrane buildings

Additional Information

Design Mark
The mark consists of the stylized word "SPRUNG" appearing above the word "STRUCTURES" in capital letters with half of a tilted wireframe sphere design appearing in a shaded rectangle above the word "SPRUNG," all appearing on the left half of the design with a vertical line dividing the mark in half, with the stylized wording "BUILD" appearing above the word "FASTER" on the right side of the design.
Color Claim
Color is not claimed as a feature of the mark.

Classification

International Classes
019 042

Disclaimers

The following terms have been disclaimed and are not claimed as part of the trademark:
Specific Disclaimer
"STRUCTURES"