Legal Representation
Attorney
Russell C. Pangborn
USPTO Deadlines
Application History
12 eventsDate | Code | Type | Description | Documents |
---|---|---|---|---|
Jul 13, 2024 | MAB2 | E | ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND | Loading... |
Jul 13, 2024 | ABN2 | O | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | Loading... |
Mar 21, 2024 | GNRN | O | NOTIFICATION OF NON-FINAL ACTION E-MAILED | Loading... |
Mar 21, 2024 | GNRT | F | NON-FINAL ACTION E-MAILED | Loading... |
Mar 21, 2024 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
Mar 18, 2024 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
Aug 5, 2023 | MDSC | E | NOTICE OF DESIGN SEARCH CODE E-MAILED | Loading... |
Aug 4, 2023 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
Jul 11, 2023 | TCCA | I | TEAS CHANGE OF CORRESPONDENCE RECEIVED | Loading... |
Jul 11, 2023 | ARAA | I | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | Loading... |
Jul 11, 2023 | REAP | I | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | Loading... |
Jul 8, 2023 | NWAP | I | NEW APPLICATION ENTERED | Loading... |
Detailed Classifications
Class 037
Advisory services relating to the maintenance of buildings; building maintenance and repair; construction project management services; consultancy in the field of basement waterproofing; drywall contractor services; electrical contracting services; fire alarm installation and repair; fireproofing of existing structures; foundation contractor services; furniture repair; general building and infrastructure contractor services; general contracting services in the field of flooring; glazing, installation, maintenance and repair of glass for building windows; home security installation advisory services; HVAC contractor services; installation of railings for buildings; installation of rainwater drainage systems; installation services for countertops; installation, changing, replacement and repair of locks; installation, maintenance and repair of automatic doors and barriers; installation, maintenance and repair of doors and fences; installation, maintenance and repair of windows and blinds; maintenance of signboards; maintenance, repair and overhaul of building exteriors, namely, exterior painting, exterior siding, retained walls, gutters, and decking; painting, interior and exterior; plumbing contracting services; project management services in the field of building construction and renovation; sealing and caulking services; sign repair; wallpapering services
Additional Information
Design Mark
The mark consists of the stylized letters "FN" and square border transition from light blue to dark blue from top to bottom. The stylized wording "FACILITY NETWORK" appears in dark blue, the top right section of the letter "Y" in "FACILITY" and the bottom right section of the letter "K" in "NETWORK" appear in light blue.
Color Claim
The color(s) light blue. dark blue, and white is/are claimed as a feature of the mark.
Classification
International Classes
037