Legal Representation
Attorney
Michael Springer
USPTO Deadlines
Next Deadline
1603 days remaining
Section 8 (6-Year) Declaration Due (Based on registration date 2023-12-19)
Due Date
December 19, 2029
Grace Period Ends
June 19, 2030
Additional deadlines exist. Contact your attorney for complete deadline information.
Application History
21 eventsDate | Code | Type | Description | Documents |
---|---|---|---|---|
Dec 19, 2023 | NRCC | E | NOTICE OF REGISTRATION CONFIRMATION EMAILED | Loading... |
Dec 19, 2023 | R.PR | A | REGISTERED-PRINCIPAL REGISTER | Loading... |
Oct 3, 2023 | NPUB | E | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | Loading... |
Oct 3, 2023 | PUBO | A | PUBLISHED FOR OPPOSITION | Loading... |
Sep 13, 2023 | NONP | E | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | Loading... |
Aug 31, 2023 | AAUA | E | NOTICE OF ACCEPTANCE OF AMENDMENT TO ALLEGE USE E-MAILED | Loading... |
Aug 30, 2023 | IUAA | P | USE AMENDMENT ACCEPTED | Loading... |
Aug 30, 2023 | CNSA | O | APPROVED FOR PUB - PRINCIPAL REGISTER | Loading... |
Jul 24, 2023 | TEME | I | TEAS/EMAIL CORRESPONDENCE ENTERED | Loading... |
Jul 22, 2023 | CRFA | I | CORRESPONDENCE RECEIVED IN LAW OFFICE | Loading... |
Jul 22, 2023 | TROA | I | TEAS RESPONSE TO OFFICE ACTION RECEIVED | Loading... |
Jul 6, 2023 | GNRN | O | NOTIFICATION OF NON-FINAL ACTION E-MAILED | Loading... |
Jul 6, 2023 | GNRT | F | NON-FINAL ACTION E-MAILED | Loading... |
Jul 6, 2023 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
May 22, 2023 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
Apr 26, 2023 | IUAF | S | USE AMENDMENT FILED | Loading... |
Apr 26, 2023 | AUPC | I | AMENDMENT TO USE PROCESSING COMPLETE | Loading... |
Apr 25, 2023 | EAAU | I | TEAS AMENDMENT OF USE RECEIVED | Loading... |
Sep 2, 2022 | MDSM | E | NOTICE OF DESIGN SEARCH CODE E-MAILED | Loading... |
Sep 1, 2022 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
Aug 16, 2022 | NWAP | I | NEW APPLICATION ENTERED | Loading... |
Detailed Classifications
Class 037
Installation, repair, maintenance, deconstruction and removal of scaffoldings, working and building platforms; installation, repair, maintenance, deconstruction and removal of shoring equipment; installation, repair, maintenance, deconstruction and removal of vertical worksite transportation systems and lifting equipment, namely hoists, man-lifts, material hoists, construction elevators, mast climbers, swing stages; installation, repair, maintenance, deconstruction and removal of temporary work site trash chutes; installation, repair, maintenance, deconstruction and removal of fencing; installation, repair, maintenance, deconstruction and removal of debris netting; insulation services, namely, the installation, removal, repair, and maintenance of insulating materials and systems; refractory services, namely, the installation, removal, repair, and maintenance of refractory materials and systems; heat tracing services, namely, the installation, removal, repair, and maintenance of materials and systems used to maintain or raise the temperature of pipes and vessels using heat tracing cables, tape or wires; inspection services, namely, the use of specialized and infrared equipment to determine heat loss or leak from insulation systems during the course of construction; industrial paint contracting services, namely surface preparation services; abatement and remediation services, namely, asbestos waste abatement and lead waste remediation
First Use Anywhere:
Apr 24, 2023
First Use in Commerce:
Apr 24, 2023
Additional Information
Design Mark
The mark consists of a stylized letter "C" formed by an incomplete circle and a stylized letter "T" contained within the circle with four curved lines coming from the left.
Color Claim
Color is not claimed as a feature of the mark.
Classification
International Classes
037