Legal Representation
Attorney
Catherine F. Hoffman
USPTO Deadlines
Next Deadline
1520 days remaining
Section 8 (6-Year) Declaration Due (Based on registration date 2024-01-02)
Due Date
January 02, 2030
Grace Period Ends
July 02, 2030
Additional deadlines exist. Contact your attorney for complete deadline information.
Application History
25 events| Date | Code | Type | Description | Documents |
|---|---|---|---|---|
| Feb 26, 2024 | REAP | I | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | Loading... |
| Feb 26, 2024 | CHAN | I | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | Loading... |
| Feb 26, 2024 | TCCA | I | TEAS CHANGE OF CORRESPONDENCE RECEIVED | Loading... |
| Feb 26, 2024 | COAR | I | TEAS CHANGE OF OWNER ADDRESS RECEIVED | Loading... |
| Feb 26, 2024 | ARAA | I | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | Loading... |
| Jan 2, 2024 | NRCC | E | NOTICE OF REGISTRATION CONFIRMATION EMAILED | Loading... |
| Jan 2, 2024 | R.PR | A | REGISTERED-PRINCIPAL REGISTER | Loading... |
| Oct 17, 2023 | NPUB | E | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | Loading... |
| Oct 17, 2023 | PUBO | A | PUBLISHED FOR OPPOSITION | Loading... |
| Sep 27, 2023 | NONP | E | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | Loading... |
| Sep 11, 2023 | XAEC | I | EXAMINER'S AMENDMENT ENTERED | Loading... |
| Sep 11, 2023 | GNEN | O | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | Loading... |
| Sep 11, 2023 | GNEA | O | EXAMINERS AMENDMENT E-MAILED | Loading... |
| Sep 11, 2023 | CNSA | O | APPROVED FOR PUB - PRINCIPAL REGISTER | Loading... |
| Sep 11, 2023 | CNEA | R | EXAMINERS AMENDMENT -WRITTEN | Loading... |
| Sep 5, 2023 | CRFA | I | CORRESPONDENCE RECEIVED IN LAW OFFICE | Loading... |
| Sep 5, 2023 | ALIE | A | ASSIGNED TO LIE | Loading... |
| Sep 5, 2023 | TEME | I | TEAS/EMAIL CORRESPONDENCE ENTERED | Loading... |
| Apr 20, 2023 | TROA | I | TEAS RESPONSE TO OFFICE ACTION RECEIVED | Loading... |
| Jan 26, 2023 | GNRN | O | NOTIFICATION OF NON-FINAL ACTION E-MAILED | Loading... |
| Jan 26, 2023 | GNRT | F | NON-FINAL ACTION E-MAILED | Loading... |
| Jan 26, 2023 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
| Jan 23, 2023 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
| Jul 21, 2022 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
| Jul 5, 2022 | NWAP | I | NEW APPLICATION ENTERED | Loading... |
Detailed Classifications
Class 009
Industrial automation controls; industrial condition monitoring systems for machines and installations comprising temperature sensors, electric sensors, vibration sensors, optical sensors, acceleration sensors and inductive sensors; electrical measuring and protection systems comprising electric sensors for power supply networks and power engineering installations; electrical control systems comprising semiconductor devices for power generation installations and power supply networks; computer display screens for the visualization of machine controls; power supply units for the power supply of control systems; digital and/or optical bus fiber connectors for the networking of servo systems and drives for machines and installations; diagnostic and monitoring units in the nature of electric sensors with visual display on a screen for the input and process control of controls for machines and installations; electronic and optical communication links for connecting machines and installations and controls; downloadable software for creating sequence programs for machines and installations; downloadable industrial automation software for controlling and tracking problems of power generation installations; downloadable software for industrial condition monitoring of machines and installations; downloadable software for measuring and protecting power supply networks and power engineering installations; downloadable software for regulating power generation installations and power supply networks
Class 042
Development of industrial automation controls, industrial condition monitoring systems for machines and installations, electrical measuring and protection systems for power supply networks and power engineering installations, electrical control systems for power generation installations and power supply networks; development of terminals for the visualization of machine controls; development of visualization systems; development of power supply units for the power supply of control systems; development of digital and/or optical bus connections for the networking of servo systems and drives for machines and installations; development of diagnostic and monitoring units with visual display on a screen for the input and process control of controls for machines and installations; development of electronic and optical communication links for the connection of machines and installations and controls; development of software for the creation of sequence programs for machines and installations; development of software for industrial automation systems; development of software for industrial condition monitoring of machines and installations, development of software for measuring and protecting power supply networks and power engineering installations; development of software for regulating power generation installations and power supply networks; development of visualization software
Additional Information
Pseudo Mark
CONDITION MONITORING SYSTEMS ADVANCED
Classification
International Classes
009
042