Legal Representation
Attorney
Patchen M. Haggerty
USPTO Deadlines
Next Deadline
725 days remaining
Section 8 Declaration Due (Principal Register) (Based on registration date 20211214)
Due Date
December 14, 2027
Grace Period Ends
June 14, 2028
Additional deadlines exist. Contact your attorney for complete deadline information.
Application History
9 events| Date | Code | Type | Description | Documents |
|---|---|---|---|---|
| Dec 14, 2021 | R.PR | A | REGISTERED-PRINCIPAL REGISTER | Loading... |
| Sep 28, 2021 | NPUB | E | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | Loading... |
| Sep 28, 2021 | PUBO | A | PUBLISHED FOR OPPOSITION | Loading... |
| Sep 8, 2021 | NONP | E | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | Loading... |
| Aug 23, 2021 | CNSA | O | APPROVED FOR PUB - PRINCIPAL REGISTER | Loading... |
| Aug 20, 2021 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
| Jul 24, 2021 | MDSC | E | NOTICE OF DESIGN SEARCH CODE E-MAILED | Loading... |
| Jul 23, 2021 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
| Apr 19, 2021 | NWAP | I | NEW APPLICATION ENTERED | Loading... |
Detailed Classifications
Class 037
Maintenance and repair of power generation equipment, namely, power lines, power substations, energy meters, and related facilities, namely, transformers, meters, protective relays and protective equipment; electrical contractor services; preventative maintenance service for electrical systems; Safety inspection services for electrical systems; maintenance and repair of heating equipment; Mining extraction; construction planning, managing, and supervision; construction of roads, streets, infrastructure, commercial and residential buildings and subdivisions; Construction services, namely, laying and construction of pipelines, electric lines, and inside electrical wiring and cabling; maintenance and repair of pipelines; management of energy-related construction projects, namely, supervision of cable and pipeline magnetization and locating; highway site development and construction services; excavation services; drilling and pumping of oil; directional drilling for installing underground pipelines, telecommunications cables, and wells; land reclamation; waste petroleum collection for recycling; installation of fire suppression systems; advisory services relating to the installation of fire prevention and suppression equipment; plumbing services; HVAC contractor services; Installation of renewable energy generation equipment; rental of construction equipment; installation and maintenance of transportation and traffic equipment and systems
First Use Anywhere:
Dec 1, 2020
First Use in Commerce:
Dec 1, 2020
Class 039
Transmission and distribution of electricity, natural gas and propane; consulting services in the field of transmission and distribution of electricity, natural gas and propane
First Use Anywhere:
Dec 1, 2020
First Use in Commerce:
Dec 1, 2020
Additional Information
Design Mark
The mark consists of two interlinking hexagons arranged horizontally, with the lower-right angle of the left hexagon and the lower-left angle of the right hexagon interlinking; to the right of the hexagons is the wording "MDU"; all above the wording "CONSTRUCTION SERVICES GROUP".
Classification
International Classes
037
039
Disclaimers
The following terms have been disclaimed and are not claimed as part of the trademark:
Specific Disclaimer
"CONSTRUCTION SERVICES GROUP"