BE BIOGAS ENGINEERING

Serial Number 90533525
Registration 6976678
700

Registration Progress

Application Filed
Feb 18, 2021
Under Examination
Approved for Publication
Nov 29, 2022
Published for Opposition
Nov 29, 2022
Registered
Feb 14, 2023

Trademark Image

BE BIOGAS ENGINEERING

Basic Information

Serial Number
90533525
Registration Number
6976678
Filing Date
February 18, 2021
Registration Date
February 14, 2023
Published for Opposition
November 29, 2022
Drawing Code
3

Status Summary

Current Status
Active
Status Code
700
Status Date
Feb 14, 2023
Registration
Registered
Classes
037 042

Rights Holder

BIOGAS ENGINEERING

03
Address
2321 East 28th Street, Suite # 400
Signal Hill, CA 90755

Ownership History

BIOGAS ENGINEERING

Original Applicant
03
Signal Hill, CA

BIOGAS ENGINEERING

Owner at Publication
03
Signal Hill, CA

BIOGAS ENGINEERING

Original Registrant
03
Signal Hill, CA

Legal Representation

Attorney
Kumar Maheshwari

USPTO Deadlines

Next Deadline
1132 days remaining
Section 8 Declaration Due (Principal Register) (Based on registration date 20230214)
Due Date
February 14, 2029
Grace Period Ends
August 14, 2029
Additional deadlines exist. Contact your attorney for complete deadline information.

Application History

30 events
Date Code Type Description Documents
Feb 14, 2023 NRCC E NOTICE OF REGISTRATION CONFIRMATION EMAILED Loading...
Feb 14, 2023 R.PR A REGISTERED-PRINCIPAL REGISTER Loading...
Nov 29, 2022 NPUB E OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED Loading...
Nov 29, 2022 PUBO A PUBLISHED FOR OPPOSITION Loading...
Nov 9, 2022 NONP E NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED Loading...
Oct 27, 2022 CNSA O APPROVED FOR PUB - PRINCIPAL REGISTER Loading...
Oct 26, 2022 TEME I TEAS/EMAIL CORRESPONDENCE ENTERED Loading...
Oct 25, 2022 CRFA I CORRESPONDENCE RECEIVED IN LAW OFFICE Loading...
Oct 25, 2022 TROA I TEAS RESPONSE TO OFFICE ACTION RECEIVED Loading...
Apr 26, 2022 GNRN O NOTIFICATION OF NON-FINAL ACTION E-MAILED Loading...
Apr 26, 2022 GNRT O NON-FINAL ACTION E-MAILED Loading...
Apr 26, 2022 CNRT R NON-FINAL ACTION WRITTEN Loading...
Mar 25, 2022 TEME I TEAS/EMAIL CORRESPONDENCE ENTERED Loading...
Mar 25, 2022 CRFA I CORRESPONDENCE RECEIVED IN LAW OFFICE Loading...
Mar 24, 2022 ALIE A ASSIGNED TO LIE Loading...
Mar 22, 2022 ALIE A ASSIGNED TO LIE Loading...
Mar 19, 2022 TROA I TEAS RESPONSE TO OFFICE ACTION RECEIVED Loading...
Sep 19, 2021 GNRN O NOTIFICATION OF NON-FINAL ACTION E-MAILED Loading...
Sep 19, 2021 GNRT F NON-FINAL ACTION E-MAILED Loading...
Sep 19, 2021 CNRT R NON-FINAL ACTION WRITTEN Loading...
Sep 14, 2021 DOCK D ASSIGNED TO EXAMINER Loading...
Aug 16, 2021 CHAN I APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED Loading...
Aug 16, 2021 TCCA I TEAS CHANGE OF CORRESPONDENCE RECEIVED Loading...
Aug 16, 2021 COAR I TEAS CHANGE OF OWNER ADDRESS RECEIVED Loading...
May 20, 2021 MDSC E NOTICE OF DESIGN SEARCH CODE E-MAILED Loading...
May 19, 2021 NWOS I NEW APPLICATION OFFICE SUPPLIED DATA ENTERED Loading...
Mar 19, 2021 CHAN I APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED Loading...
Mar 19, 2021 TCCA I TEAS CHANGE OF CORRESPONDENCE RECEIVED Loading...
Mar 19, 2021 COAR I TEAS CHANGE OF OWNER ADDRESS RECEIVED Loading...
Feb 22, 2021 NWAP I NEW APPLICATION ENTERED Loading...

Detailed Classifications

Class 037
Construction of facilities in the biogas to renewable energy field, namely, construction of facilities for storage, production, distribution and transportation of biogas for energy production purposes and construction of facilities for producing electric energy and heat from biogas; Construction site preparation, namely, installation of utilities and processing equipment in construction sites for energy production facilities and for facilities for use in connection with for storage, production, distribution and transportation of biogas for energy production purposes; Construction project management services, namely, construction management and maintenance of facilities for storage, production, distribution and transportation of biogas for energy production purposes in the field of biogas collection and biogas utilization projects; Maintenance and repair of infrastructure and facilities in the biogas-to-energy field; construction site preparation, namely, planning and laying out of utilities for energy production facilities; construction consulting in the biogas to renewable energy field, namely, consulting in the field of construction of biogas to renewable energy field facilities which store, produce, distribute and transport biogas for energy production purposes; consulting in the field of construction of biogas to renewable energy facilities for producing electric energy and heat from biogas
First Use Anywhere: Mar 7, 2016
First Use in Commerce: Mar 7, 2016
Class 042
Engineering design, namely, civil and mechanical engineering design in the biogas to renewable energy field, namely, civil and mechanical engineering design in the fields of constructing energy production facilities and biogas storage, production, distribution and transportation facilities; Engineering design, namely, civil and mechanical engineering design in the fields of cleanup and treatment system design, facility design, collection and control system design, methane mitigation system design, foundation and building design, landfill cell and sequencing design, and hydrological modeling in the biogas to renewable energy field
First Use Anywhere: Mar 7, 2016
First Use in Commerce: Mar 7, 2016

Additional Information

Design Mark
The mark consists of the stylized wording "BE BIOGAS ENGINEERING" and design featuring a stylized "BE" inside a rectangle and the words "BIOGAS ENGINEERING" next to the rectangle.

Classification

International Classes
037 042

Disclaimers

The following terms have been disclaimed and are not claimed as part of the trademark:
Specific Disclaimer
"BIOGAS ENGINEERING"