USPTO Deadlines
Application History
9 eventsDate | Code | Type | Description | Documents |
---|---|---|---|---|
Feb 16, 2022 | ABN2 | O | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | Loading... |
Feb 16, 2022 | MAB2 | E | ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND | Loading... |
Aug 3, 2021 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
Aug 3, 2021 | GNRT | F | NON-FINAL ACTION E-MAILED | Loading... |
Aug 3, 2021 | GNRN | O | NOTIFICATION OF NON-FINAL ACTION E-MAILED | Loading... |
Jul 19, 2021 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
Apr 8, 2021 | MDSC | E | NOTICE OF DESIGN SEARCH CODE E-MAILED | Loading... |
Apr 7, 2021 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
Jan 12, 2021 | NWAP | I | NEW APPLICATION ENTERED | Loading... |
Detailed Classifications
Class 011
I will do Class 011 lamps, Solar water heaters, LED lights, Heating systems for residential and commercial buildings comprised of biomass burners, boilers, valves, pipes, manifolds, solar panels, control panels, switches and electrical wire, all sold as a unit, LED (light emitting diodes) lighting fixtures for use in display, commercial, industrial, residential, and architectural accent lighting applications, LED light bulbs, LED light lamps
First Use Anywhere:
Dec 4, 2020
First Use in Commerce:
Dec 4, 2020
Additional Information
Design Mark
The mark consists of EcoKG.
Pseudo Mark
ECO KG
Classification
International Classes
011