USPTO Deadlines
Application History
8 events| Date | Code | Type | Description | Documents |
|---|---|---|---|---|
| Oct 29, 2020 | MAB2 | E | ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND | Loading... |
| Oct 29, 2020 | ABN2 | O | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | Loading... |
| Apr 17, 2020 | GNRN | O | NOTIFICATION OF NON-FINAL ACTION E-MAILED | Loading... |
| Apr 17, 2020 | GNRT | F | NON-FINAL ACTION E-MAILED | Loading... |
| Apr 17, 2020 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
| Apr 14, 2020 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
| Jan 29, 2020 | MDSC | E | NOTICE OF DESIGN SEARCH CODE E-MAILED | Loading... |
| Jan 28, 2020 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
Detailed Classifications
Class 009
Water flowmeters
First Use Anywhere:
Jul 9, 2019
First Use in Commerce:
Oct 11, 2019
Additional Information
Design Mark
The mark consists of the lowercase word "every drop" with 2 drops of water dripping into the letter 'y' in every drop. The word "technologies" appears in small font, all caps, between the tail of the 'y' and the 'p' in every drop.
Color Claim
Color is not claimed as a feature of the mark.
Classification
International Classes
009