HYDRO-NET

Serial Number 88602294
Registration 7683386
700

Registration Progress

Application Filed
Sep 3, 2019
Under Examination
Jan 24, 2023
Approved for Publication
Nov 29, 2022
Published for Opposition
Nov 29, 2022
Registered
Feb 11, 2025

Trademark Image

HYDRO-NET

Basic Information

Serial Number
88602294
Registration Number
7683386
Filing Date
September 3, 2019
Registration Date
February 11, 2025
Published for Opposition
November 29, 2022
Drawing Code
4

Status Summary

Current Status
Active
Status Code
700
Status Date
Feb 11, 2025
Registration
Registered
Classes
009

Rights Holder

Hydronix Limited

99
Address
Units 11-12, Henley Business Park
Pirbright Road
Normandy, Guildford SurreyGU3
GB

Ownership History

Hydronix Limited

Original Applicant
99
Normandy, Guildford GB

Hydronix Limited

Owner at Publication
99
Normandy, Guildford GB

Hydronix Limited

Original Registrant
99
Normandy, Guildford GB

Legal Representation

Attorney
Jess M. Collen

USPTO Deadlines

Next Deadline
2036 days remaining
Section 8 (6-Year) Declaration Due (Based on registration date 2025-02-11)
Due Date
February 11, 2031
Grace Period Ends
August 11, 2031
Additional deadlines exist. Contact your attorney for complete deadline information.

Application History

50 events
Date Code Type Description Documents
Feb 11, 2025 NRCC E NOTICE OF REGISTRATION CONFIRMATION EMAILED Loading...
Feb 11, 2025 R.PR A REGISTERED-PRINCIPAL REGISTER Loading...
Aug 9, 2024 DP1B I 1(B) BASIS DELETED; PROCEED TO REGISTRATION Loading...
Jul 23, 2024 D1BR I TEAS DELETE 1(B) BASIS RECEIVED Loading...
Jul 23, 2024 IUCN S NOTICE OF ALLOWANCE CANCELLED Loading...
Feb 8, 2024 EXRA E NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED Loading...
Feb 7, 2024 EX2G S SOU EXTENSION 2 GRANTED Loading...
Feb 7, 2024 AITU A CASE ASSIGNED TO INTENT TO USE PARALEGAL Loading...
Jan 23, 2024 EXT2 S SOU EXTENSION 2 FILED Loading...
Jan 23, 2024 EEXT I SOU TEAS EXTENSION RECEIVED Loading...
Jul 26, 2023 EXRA E NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED Loading...
Jul 24, 2023 EX1G S SOU EXTENSION 1 GRANTED Loading...
Jul 24, 2023 EXT1 S SOU EXTENSION 1 FILED Loading...
Jul 24, 2023 EEXT I SOU TEAS EXTENSION RECEIVED Loading...
Jan 24, 2023 NOAM E NOA E-MAILED - SOU REQUIRED FROM APPLICANT Loading...
Nov 29, 2022 NPUB E OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED Loading...
Nov 29, 2022 PUBO A PUBLISHED FOR OPPOSITION Loading...
Nov 9, 2022 NONP E NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED Loading...
Oct 24, 2022 CNSA P APPROVED FOR PUB - PRINCIPAL REGISTER Loading...
Oct 24, 2022 XAEC I EXAMINER'S AMENDMENT ENTERED Loading...
Oct 24, 2022 GNEN O NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED Loading...
Oct 24, 2022 GNEA O EXAMINERS AMENDMENT E-MAILED Loading...
Oct 24, 2022 CNEA R EXAMINERS AMENDMENT -WRITTEN Loading...
Oct 21, 2022 TEME I TEAS/EMAIL CORRESPONDENCE ENTERED Loading...
Oct 20, 2022 CRFA I CORRESPONDENCE RECEIVED IN LAW OFFICE Loading...
Oct 20, 2022 ERSI I TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED Loading...
Apr 29, 2022 RCSC S REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED Loading...
Apr 20, 2022 GNFN O NOTIFICATION OF FINAL REFUSAL EMAILED Loading...
Apr 20, 2022 GNFR O FINAL REFUSAL E-MAILED Loading...
Apr 20, 2022 CNFR R FINAL REFUSAL WRITTEN Loading...
Aug 30, 2021 RCSC S REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED Loading...
Jul 22, 2021 CHAN I APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED Loading...
Jul 22, 2021 TCCA I TEAS CHANGE OF CORRESPONDENCE RECEIVED Loading...
Jul 22, 2021 COAR I TEAS CHANGE OF OWNER ADDRESS RECEIVED Loading...
Feb 2, 2021 RCSC S REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED Loading...
Jul 13, 2020 GNS3 O NOTIFICATION OF LETTER OF SUSPENSION E-MAILED Loading...
Jul 13, 2020 GNSL S LETTER OF SUSPENSION E-MAILED Loading...
Jul 13, 2020 CNSL R SUSPENSION LETTER WRITTEN Loading...
Jun 18, 2020 TEME I TEAS/EMAIL CORRESPONDENCE ENTERED Loading...
Jun 18, 2020 CRFA I CORRESPONDENCE RECEIVED IN LAW OFFICE Loading...
Jun 17, 2020 TEME I TEAS/EMAIL CORRESPONDENCE ENTERED Loading...
Jun 17, 2020 CRFA I CORRESPONDENCE RECEIVED IN LAW OFFICE Loading...
Jun 16, 2020 ALIE A ASSIGNED TO LIE Loading...
Jun 8, 2020 PARI I TEAS VOLUNTARY AMENDMENT RECEIVED Loading...
Jun 5, 2020 TROA I TEAS RESPONSE TO OFFICE ACTION RECEIVED Loading...
Dec 9, 2019 GNRN O NOTIFICATION OF NON-FINAL ACTION E-MAILED Loading...
Dec 9, 2019 GNRT F NON-FINAL ACTION E-MAILED Loading...
Dec 9, 2019 CNRT R NON-FINAL ACTION WRITTEN Loading...
Dec 5, 2019 DOCK D ASSIGNED TO EXAMINER Loading...
Sep 13, 2019 NWOS I NEW APPLICATION OFFICE SUPPLIED DATA ENTERED Loading...

Detailed Classifications

Class 009
Downloadable computer software tools used to configure, maintain and calibrate microwave moisture sensor to monitor moisture levels in manufacturing facilities that produce concrete, sand and aggregates, asphalt, clay, and animal feed; recorded computer software tools used to configure, maintain and calibrate microwave moisture to monitor moisture levels in manufacturing facilities that produce concrete, sand and aggregates, asphalt, clay, and animal feed; measuring, controlling and sensing apparatus and instruments, namely, electrical transducers, moisture-measuring apparatus and instruments, and microwave sensing apparatus and structural parts therefor to monitor moisture levels in manufacturing facilities that produce concrete, sand and aggregates, asphalt, clay, and animal feed; moisture sensing apparatus, namely, on-line industrial sensors for the use of measuring the moisture content and brix value of materials in industrial production processes, micro-processor based interfacing units which display moisture content and brix value, and structural parts therefor all for use in monitoring moisture levels in manufacturing facilities that produce concrete, sand and aggregates, asphalt, clay, and animal feed

Classification

International Classes
009