GDY

Serial Number 87912938
Registration 5978881
700

Registration Progress

Application Filed
May 9, 2018
Under Examination
Jul 30, 2019
Approved for Publication
Jun 4, 2019
Published for Opposition
Jun 4, 2019
Registered
Feb 4, 2020

Attorney Assistance

Section 8 Declaration Due (Principal Register) (Based on registration date 20200204)
Due: Feb 04, 2026 20 days

Trademark Image

GDY

Basic Information

Serial Number
87912938
Registration Number
5978881
Filing Date
May 9, 2018
Registration Date
February 4, 2020
Published for Opposition
June 4, 2019
Drawing Code
4

Status Summary

Current Status
Active
Status Code
700
Status Date
Feb 4, 2020
Registration
Registered
Classes
009

Rights Holder

AMAZFIT INC

03
Address
1030 NORCROSS INDUSTRIAL CT, SUTIE 118
NORCROSS,, GA 30071

Ownership History

MARIETTA INC

Original Applicant
03
Atlanta, GA

MARIETTA INC

Owner at Publication
03
Atlanta, GA

MARIETTA INC

Original Registrant
03
Atlanta, GA

AMAZFIT INC

New Owner After Registration #1
03
NORCROSS,, GA

Legal Representation

Attorney
Henry G. Chow

USPTO Deadlines

Next Deadline
20 days remaining
Section 8 Declaration Due (Principal Register) (Based on registration date 20200204)
Due Date
February 04, 2026
Grace Period Ends
August 04, 2026
Additional deadlines exist. Contact your attorney for complete deadline information.

Application History

34 events
Date Code Type Description Documents
Feb 26, 2025 ASGN I AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP Loading...
Feb 4, 2025 REM1 E COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED Loading...
Aug 30, 2021 TCCA I TEAS CHANGE OF CORRESPONDENCE RECEIVED Loading...
Aug 30, 2021 ARAA I ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED Loading...
Aug 30, 2021 REAP I TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED Loading...
Feb 4, 2020 R.PR A REGISTERED-PRINCIPAL REGISTER Loading...
Jan 3, 2020 SUNA E NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED Loading...
Jan 2, 2020 CNPR P ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED Loading...
Dec 19, 2019 SUPC I STATEMENT OF USE PROCESSING COMPLETE Loading...
Dec 12, 2019 IUAF S USE AMENDMENT FILED Loading...
Dec 19, 2019 AITU A CASE ASSIGNED TO INTENT TO USE PARALEGAL Loading...
Dec 12, 2019 EISU I TEAS STATEMENT OF USE RECEIVED Loading...
Jul 30, 2019 NOAM E NOA E-MAILED - SOU REQUIRED FROM APPLICANT Loading...
Jun 4, 2019 NPUB E OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED Loading...
Jun 4, 2019 PUBO A PUBLISHED FOR OPPOSITION Loading...
May 15, 2019 NONP E NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED Loading...
Apr 26, 2019 CNSA P APPROVED FOR PUB - PRINCIPAL REGISTER Loading...
Apr 25, 2019 TEME I TEAS/EMAIL CORRESPONDENCE ENTERED Loading...
Apr 25, 2019 CRFA I CORRESPONDENCE RECEIVED IN LAW OFFICE Loading...
Apr 25, 2019 ALIE A ASSIGNED TO LIE Loading...
Apr 17, 2019 TCCA I TEAS CHANGE OF CORRESPONDENCE RECEIVED Loading...
Apr 18, 2019 NREV E NOTICE OF REVIVAL - E-MAILED Loading...
Apr 17, 2019 TROA I TEAS RESPONSE TO OFFICE ACTION RECEIVED Loading...
Apr 17, 2019 PETG O PETITION TO REVIVE-GRANTED Loading...
Apr 17, 2019 PROA I TEAS PETITION TO REVIVE RECEIVED Loading...
Mar 15, 2019 MAB2 E ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND Loading...
Mar 15, 2019 MAB2 O ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND Loading...
Mar 15, 2019 ABN2 O ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE Loading...
Aug 30, 2018 GNRN O NOTIFICATION OF NON-FINAL ACTION E-MAILED Loading...
Aug 30, 2018 GNRT F NON-FINAL ACTION E-MAILED Loading...
Aug 30, 2018 CNRT R NON-FINAL ACTION WRITTEN Loading...
Aug 30, 2018 DOCK D ASSIGNED TO EXAMINER Loading...
May 17, 2018 NWOS I NEW APPLICATION OFFICE SUPPLIED DATA ENTERED Loading...
May 12, 2018 NWAP I NEW APPLICATION ENTERED Loading...

Detailed Classifications

Class 009
Kits comprised primarily of a fire hose and also including a fire nozzle and non-metallic fire hose adapter sold as a unit; LCD panels; Off-grid power and deep cycle battery storage systems comprised of batteries, charge controllers and inverters with integrated LED bulbs and LED light fixtures for solar, thin-film solar (TFS), vertical axis wind turbine (VAWT) installations; Power access port for use with electrical control panels for connecting multiple data and electrical devices; Solar panels for production of electricity; Solar-powered battery chargers; Wire connectors; Apparatus for converting electronic radiation to electrical energy, namely, photovoltaic solar hybrid modules; Battery charge devices; Electric adapter cables; Electric charging cables; Electric wire and cable;Electronic sensors for measuring solar radiation; Photovoltaic solar modules for production of electricity; Thin-film solar (TFS), vertical axis wind turbine (VAWT) and Hybrid TFS VAWT off-grid power and deep cycle battery storage systems composed of batteries, charge controllers and inverters with integrated LED bulbs and LED light fixtures
First Use Anywhere: Dec 3, 2018
First Use in Commerce: Dec 3, 2018

Classification

International Classes
009