USPTO Deadlines
Next Deadline
29 days remaining
Section 8 (6-Year) Declaration Due (Based on registration date 2019-08-27)
Due Date
August 27, 2025
Grace Period Ends
February 27, 2026
Additional deadlines exist. Contact your attorney for complete deadline information.
Application History
26 eventsDate | Code | Type | Description | Documents |
---|---|---|---|---|
Aug 27, 2024 | REM1 | E | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | Loading... |
Aug 27, 2019 | R.PR | A | REGISTERED-PRINCIPAL REGISTER | Loading... |
Jul 24, 2019 | SUNA | E | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | Loading... |
Jul 23, 2019 | CNPR | P | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | Loading... |
Jul 22, 2019 | SUPC | I | STATEMENT OF USE PROCESSING COMPLETE | Loading... |
Jul 22, 2019 | AITU | A | CASE ASSIGNED TO INTENT TO USE PARALEGAL | Loading... |
Jun 30, 2019 | IUAF | S | USE AMENDMENT FILED | Loading... |
Jun 30, 2019 | EISU | I | TEAS STATEMENT OF USE RECEIVED | Loading... |
Jan 1, 2019 | NOAM | E | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | Loading... |
Nov 6, 2018 | NPUB | E | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | Loading... |
Nov 6, 2018 | PUBO | A | PUBLISHED FOR OPPOSITION | Loading... |
Oct 17, 2018 | NONP | E | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | Loading... |
Sep 28, 2018 | PREV | O | LAW OFFICE PUBLICATION REVIEW COMPLETED | Loading... |
Sep 28, 2018 | ALIE | A | ASSIGNED TO LIE | Loading... |
Sep 18, 2018 | CNSA | P | APPROVED FOR PUB - PRINCIPAL REGISTER | Loading... |
Sep 18, 2018 | XAEC | I | EXAMINER'S AMENDMENT ENTERED | Loading... |
Sep 18, 2018 | GNEN | O | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | Loading... |
Sep 18, 2018 | GNEA | O | EXAMINERS AMENDMENT E-MAILED | Loading... |
Sep 18, 2018 | CNEA | R | EXAMINERS AMENDMENT -WRITTEN | Loading... |
Mar 26, 2018 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
Mar 26, 2018 | GNRN | O | NOTIFICATION OF NON-FINAL ACTION E-MAILED | Loading... |
Mar 26, 2018 | GNRT | F | NON-FINAL ACTION E-MAILED | Loading... |
Mar 24, 2018 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
Dec 26, 2017 | MDSC | E | NOTICE OF DESIGN SEARCH CODE E-MAILED | Loading... |
Dec 23, 2017 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
Dec 16, 2017 | NWAP | I | NEW APPLICATION ENTERED | Loading... |
Detailed Classifications
Class 037
Building maintenance and repair; Machinery installation, maintenance and repair
First Use Anywhere:
Jan 1, 2018
First Use in Commerce:
Jan 1, 2018
Additional Information
Design Mark
The mark consists of a central circle with an egg-shaped hole that removes most of the upper part of the central circle, leaving a crescent shape with symmetrical arms on both sides of the egg-shaped hole. These arms become narrower as they approach the top of the circle, and terminate leaving a small gap between the points. At the bottom of the egg-shaped hole, the crescent is seamlessly joined to a large upward-pointing arrow that covers most of the upper portion of the egg-shaped hole, that tapers as it approaches the top. The head (top) of the arrow is a triangular shape with the lower-left and lower-right corners angled back, so that its three corners are at the vertices of a roughly equilateral triangle. The lower edges of the head of the arrow meet the shaft of the arrow at symmetrical angles that would converge at the center of the equilateral triangle if they were extended past where they meet the central shaft of the arrow. The head of the arrow terminates slightly beyond the perimeter of the central circle. The central circle is surrounded by a narrow, ring-like gear with ten or more cogs. There is a narrow gap between the inside of the gear and the central circle. The gear fades out from the bottom to the top, becoming almost invisible at the top, where the top of the arrow protrudes just into the top cog. The wording "POWER UP!" appears below the design.
Color Claim
Color is not claimed as a feature of the mark.
Classification
International Classes
037