ORCHESTRATING THE RHYTHM OF THE GRID

Serial Number 87405125
Registration 5897619
700

Registration Progress

Application Filed
Apr 10, 2017
Under Examination
Oct 24, 2017
Approved for Publication
Aug 29, 2017
Published for Opposition
Aug 29, 2017
Registered
Oct 29, 2019

Attorney Assistance

Section 8 Declaration Due (Principal Register) (Based on registration date 20191029) (Grace Period Filing)
Due: Apr 29, 2026 Grace Period - 107 days
Original deadline was Oct 29, 2025 (overdue)

Trademark Image

ORCHESTRATING THE RHYTHM OF THE GRID

Basic Information

Serial Number
87405125
Registration Number
5897619
Filing Date
April 10, 2017
Registration Date
October 29, 2019
Published for Opposition
August 29, 2017
Drawing Code
4

Status Summary

Current Status
Active
Status Code
700
Status Date
Oct 29, 2019
Registration
Registered
Classes
009

Rights Holder

American Superconductor Corporation

03
Address
114 East Main Street
Ayer, MA 01432

Ownership History

American Superconductor Corporation

Original Applicant
03
Devens, MA

American Superconductor Corporation

Owner at Publication
03
Ayer, MA

American Superconductor Corporation

Original Registrant
03
Ayer, MA

Legal Representation

Attorney
John W. Powell

USPTO Deadlines

Next Deadline
In Grace Period
Section 8 Declaration Due (Principal Register) (Based on registration date 20191029)
Due Date
October 29, 2025
Grace Period Ends
April 29, 2026
Additional deadlines exist. Contact your attorney for complete deadline information.

Application History

47 events
Date Code Type Description Documents
Dec 17, 2025 TCCA I TEAS CHANGE OF CORRESPONDENCE RECEIVED Loading...
Dec 17, 2025 ARAA I ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED Loading...
Dec 17, 2025 REAP I TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED Loading...
Oct 29, 2024 REM1 E COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED Loading...
Dec 28, 2021 TCCA I TEAS CHANGE OF CORRESPONDENCE RECEIVED Loading...
Dec 28, 2021 EWAF I TEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS Loading...
Dec 28, 2021 ARAA I ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED Loading...
Dec 28, 2021 REAP I TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED Loading...
Feb 18, 2021 CHAN I APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED Loading...
Feb 18, 2021 TCCA I TEAS CHANGE OF CORRESPONDENCE RECEIVED Loading...
Feb 18, 2021 ARAA I ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED Loading...
Feb 18, 2021 REAP I TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED Loading...
Feb 18, 2021 COAR I TEAS CHANGE OF OWNER ADDRESS RECEIVED Loading...
Oct 29, 2019 R.PR A REGISTERED-PRINCIPAL REGISTER Loading...
Sep 26, 2019 SUNA E NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED Loading...
Sep 25, 2019 CNPR P ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED Loading...
Sep 25, 2019 SUPC I STATEMENT OF USE PROCESSING COMPLETE Loading...
Sep 5, 2019 IUAF S USE AMENDMENT FILED Loading...
Sep 24, 2019 AITU A CASE ASSIGNED TO INTENT TO USE PARALEGAL Loading...
Sep 5, 2019 EISU I TEAS STATEMENT OF USE RECEIVED Loading...
Apr 13, 2019 EXRA E NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED Loading...
Apr 11, 2019 EX3G S SOU EXTENSION 3 GRANTED Loading...
Apr 11, 2019 EXT3 S SOU EXTENSION 3 FILED Loading...
Apr 11, 2019 EEXT I SOU TEAS EXTENSION RECEIVED Loading...
Oct 5, 2018 EXRA E NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED Loading...
Oct 3, 2018 EX2G S SOU EXTENSION 2 GRANTED Loading...
Oct 3, 2018 EXT2 S SOU EXTENSION 2 FILED Loading...
Oct 3, 2018 EEXT I SOU TEAS EXTENSION RECEIVED Loading...
Apr 19, 2018 EXRA E NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED Loading...
Apr 17, 2018 EX1G S SOU EXTENSION 1 GRANTED Loading...
Apr 17, 2018 EXT1 S SOU EXTENSION 1 FILED Loading...
Apr 17, 2018 EEXT I SOU TEAS EXTENSION RECEIVED Loading...
Oct 24, 2017 NOAM E NOA E-MAILED - SOU REQUIRED FROM APPLICANT Loading...
Aug 29, 2017 NPUB E OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED Loading...
Aug 29, 2017 PUBO A PUBLISHED FOR OPPOSITION Loading...
Aug 9, 2017 NONP E NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED Loading...
Jul 6, 2017 CNSA P APPROVED FOR PUB - PRINCIPAL REGISTER Loading...
Jul 6, 2017 XAEC I EXAMINER'S AMENDMENT ENTERED Loading...
Jul 6, 2017 GNEN O NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED Loading...
Jul 6, 2017 GNEA O EXAMINERS AMENDMENT E-MAILED Loading...
Jul 6, 2017 CNEA R EXAMINERS AMENDMENT -WRITTEN Loading...
Jul 5, 2017 GNRN O NOTIFICATION OF NON-FINAL ACTION E-MAILED Loading...
Jul 5, 2017 GNRT F NON-FINAL ACTION E-MAILED Loading...
Jul 5, 2017 CNRT R NON-FINAL ACTION WRITTEN Loading...
Jun 30, 2017 DOCK D ASSIGNED TO EXAMINER Loading...
Apr 17, 2017 NWOS I NEW APPLICATION OFFICE SUPPLIED DATA ENTERED Loading...
Apr 13, 2017 NWAP I NEW APPLICATION ENTERED Loading...

Detailed Classifications

Class 009
Superconductor electric/electrical wires; reels for superconductor electric wires; superconductor electric coils; electrical power converters; synchronous condensers; superconductor electrical current conductors; electrical power storage and power quality equipment and systems, namely, voltage restorers used for utility voltage regulation; electrical power quality equipment and systems, namely, reactive power compensation systems used to provide voltage regulation for utility transmission and distribution systems; voltage restorers primarily used for voltage sag protection for commercial and industrial facilities and/or critical loads; electrical power quality equipment and systems for use in transmission and distribution power grid applications, namely, synchronous condensers capable of generating or absorbing reactive power used to ensure reliable flow of electricity through AC power grids
First Use Anywhere: May 24, 2019
First Use in Commerce: May 24, 2019

Classification

International Classes
009