USPTO Deadlines
Application History
9 events| Date | Code | Type | Description | Documents |
|---|---|---|---|---|
| Jan 11, 2018 | MAB2 | O | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | Loading... |
| Jan 11, 2018 | ABN2 | O | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | Loading... |
| Jun 15, 2017 | GNRN | O | NOTIFICATION OF NON-FINAL ACTION E-MAILED | Loading... |
| Jun 15, 2017 | GNRT | F | NON-FINAL ACTION E-MAILED | Loading... |
| Jun 15, 2017 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
| Jun 15, 2017 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
| Mar 28, 2017 | MDSC | E | NOTICE OF DESIGN SEARCH CODE E-MAILED | Loading... |
| Mar 27, 2017 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
| Mar 25, 2017 | NWAP | I | NEW APPLICATION ENTERED | Loading... |
Detailed Classifications
Class 037
Plumbing contractor services; Installation and repair of heating, ventilating and air conditioning equipment
First Use Anywhere:
Mar 1, 2017
First Use in Commerce:
Mar 2, 2017
Additional Information
Design Mark
The mark consists of the word Advantage in capital letters with red font followed by three large directional arrows consisting of the colors gray, red, and black pointing in the direction of right.
Color Claim
The color(s) red, gray, black, and white is/are claimed as a feature of the mark.
Classification
International Classes
037