ETHOSENERGY

Serial Number 86246169
Registration 5829163
700

Registration Progress

Application Filed
Apr 8, 2014
Under Examination
Jul 10, 2018
Approved for Publication
May 15, 2018
Published for Opposition
May 15, 2018
Registered
Aug 6, 2019

Attorney Assistance

Section 8 (6-Year) Declaration Due (Based on registration date 2019-08-06)
Due: Aug 06, 2025 7 days

Trademark Image

ETHOSENERGY

Basic Information

Serial Number
86246169
Registration Number
5829163
Filing Date
April 8, 2014
Registration Date
August 6, 2019
Published for Opposition
May 15, 2018
Drawing Code
3

Status Summary

Current Status
Active
Status Code
700
Status Date
Aug 6, 2019
Registration
Registered
Classes
042

Rights Holder

Ethos Energy Group Limited

03
Address
Ethos House
Craigshaw Business Park, Craigshaw
Aberdeen AB123QH
GB

Ownership History

Ethos Energy Group Limited

Original Applicant
03
Aberdeen GB

Ethos Energy Group Limited

Owner at Publication
03
Aberdeen GB

Ethos Energy Group Limited

Original Registrant
03
Aberdeen GB

Legal Representation

Attorney
Elizabeth K. Stanley

USPTO Deadlines

Next Deadline
7 days remaining
Section 8 (6-Year) Declaration Due (Based on registration date 2019-08-06)
Due Date
August 06, 2025
Grace Period Ends
February 06, 2026
Additional deadlines exist. Contact your attorney for complete deadline information.

Application History

50 events
Date Code Type Description Documents
Aug 6, 2024 REM1 E COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED Loading...
Aug 6, 2019 R.PR A REGISTERED-PRINCIPAL REGISTER Loading...
Jun 29, 2019 SUNA E NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED Loading...
Jun 28, 2019 CNPR P ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED Loading...
Jun 27, 2019 EXRA E NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED Loading...
Jun 26, 2019 SUPC I STATEMENT OF USE PROCESSING COMPLETE Loading...
Jun 26, 2019 EX2G S SOU EXTENSION 2 GRANTED Loading...
Jun 26, 2019 AITU A CASE ASSIGNED TO INTENT TO USE PARALEGAL Loading...
Jun 24, 2019 EEXT I SOU TEAS EXTENSION RECEIVED Loading...
Jun 24, 2019 EISU I TEAS STATEMENT OF USE RECEIVED Loading...
Jun 24, 2019 IUAF S USE AMENDMENT FILED Loading...
Jun 24, 2019 EXT2 S SOU EXTENSION 2 FILED Loading...
Dec 21, 2018 EXRA E NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED Loading...
Dec 19, 2018 EX1G S SOU EXTENSION 1 GRANTED Loading...
Dec 19, 2018 EXT1 S SOU EXTENSION 1 FILED Loading...
Dec 19, 2018 EEXT I SOU TEAS EXTENSION RECEIVED Loading...
Jul 10, 2018 NOAM E NOA E-MAILED - SOU REQUIRED FROM APPLICANT Loading...
May 15, 2018 NPUB E OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED Loading...
May 15, 2018 PUBO A PUBLISHED FOR OPPOSITION Loading...
Apr 25, 2018 NONP E NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED Loading...
Apr 12, 2018 ALIE A ASSIGNED TO LIE Loading...
Apr 4, 2018 CNSA P APPROVED FOR PUB - PRINCIPAL REGISTER Loading...
Apr 4, 2018 XAEC I EXAMINER'S AMENDMENT ENTERED Loading...
Apr 4, 2018 CNEA R EXAMINERS AMENDMENT -WRITTEN Loading...
Apr 4, 2018 GNEN O NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED Loading...
Apr 4, 2018 GNEA O EXAMINERS AMENDMENT E-MAILED Loading...
Apr 3, 2018 TEME I TEAS/EMAIL CORRESPONDENCE ENTERED Loading...
Apr 2, 2018 CRFA I CORRESPONDENCE RECEIVED IN LAW OFFICE Loading...
Apr 2, 2018 ERFR I TEAS REQUEST FOR RECONSIDERATION RECEIVED Loading...
Oct 2, 2017 CNFR R FINAL REFUSAL WRITTEN Loading...
Oct 2, 2017 GNFN O NOTIFICATION OF FINAL REFUSAL EMAILED Loading...
Oct 2, 2017 GNFR O FINAL REFUSAL E-MAILED Loading...
Sep 8, 2017 TEME I TEAS/EMAIL CORRESPONDENCE ENTERED Loading...
Sep 7, 2017 CRFA I CORRESPONDENCE RECEIVED IN LAW OFFICE Loading...
Sep 7, 2017 TROA I TEAS RESPONSE TO OFFICE ACTION RECEIVED Loading...
Mar 9, 2017 GNRN O NOTIFICATION OF NON-FINAL ACTION E-MAILED Loading...
Mar 9, 2017 GNRT O NON-FINAL ACTION E-MAILED Loading...
Mar 9, 2017 CNRT R NON-FINAL ACTION WRITTEN Loading...
Feb 13, 2017 RCCK S SUSPENSION CHECKED - TO ATTORNEY FOR ACTION Loading...
Jul 20, 2016 RCSC S REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED Loading...
Jan 14, 2016 RCSC S REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED Loading...
Jul 9, 2015 RCSC S REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED Loading...
Jul 3, 2015 ALIE A ASSIGNED TO LIE Loading...
Dec 8, 2014 GNSL S LETTER OF SUSPENSION E-MAILED Loading...
Dec 8, 2014 GNS3 O NOTIFICATION OF LETTER OF SUSPENSION E-MAILED Loading...
Dec 8, 2014 CNSL R SUSPENSION LETTER WRITTEN Loading...
Nov 14, 2014 CRFA I CORRESPONDENCE RECEIVED IN LAW OFFICE Loading...
Nov 14, 2014 TEME I TEAS/EMAIL CORRESPONDENCE ENTERED Loading...
Nov 14, 2014 TROA I TEAS RESPONSE TO OFFICE ACTION RECEIVED Loading...
May 14, 2014 GNRT F NON-FINAL ACTION E-MAILED Loading...

Detailed Classifications

Class 042
Technology consulting services in the field of operating power generation equipment and other mechanical drive rotating equipment, including ancillary systems critical to their function, to assist oil and gas facility owners, operators and maintenance providers in improving production performance through use of critical rotating equipment; Design and development of capital spare parts for gas and steam turbines; Design and development of equipment used to increase power output in gas and steam turbines; Design and development of control systems for rotating equipment; Design and development of gas turbine cleaning solutions; Design and development of parts, accessories and systems used to optimize efficiency of gas and steam turbine equipment; Design and development of auxiliary systems for industrial equipment; Engineering services to assist power plant owners and operators in providing gas turbine, thermal power and/or coal driven solutions; Engineering services in the field of improving production performance through the use of critical rotating equipment; Design and development of ancillary equipment used in power generation in the nature of electro-mechanical skids, hydraulic skids, gas turbine auxiliary skids, heat recovery steam generators, steam engine boilers for power generation, electric generators, transformers, hydraulic controls for machines, hydraulic torque converters, hydraulic power units, hydraulic pumps, centrifugal pumps, gears, and electric control panels; all of the foregoing for the power plant, oil and gas, industrial, power and renewable energy industries
First Use Anywhere: 20161100
First Use in Commerce: 20161100

Additional Information

Design Mark
The mark consists of a pentagon shape with the words "ETHOSENERGY" to the right.
Color Claim
Color is not claimed as a feature of the mark.
Pseudo Mark
ETHOS ENERGY

Classification

International Classes
042