Legal Representation
Attorney
Taffie N. Jones
USPTO Deadlines
Next Deadline
1878 days remaining
Section 8 & 9 Renewal Due (Principal Register) (Based on registration date 20110329)
Due Date
March 29, 2031
Grace Period Ends
September 29, 2031
Application History
40 events| Date | Code | Type | Description | Documents |
|---|---|---|---|---|
| Mar 31, 2025 | EWAF | I | TEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS | Loading... |
| Mar 31, 2025 | TCCA | I | TEAS CHANGE OF CORRESPONDENCE RECEIVED | Loading... |
| Mar 31, 2025 | ARAA | I | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | Loading... |
| Mar 31, 2025 | REAP | I | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | Loading... |
| Jul 6, 2021 | NA89 | E | NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED | Loading... |
| Jul 6, 2021 | RNL1 | Q | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | Loading... |
| Jul 6, 2021 | 89AG | O | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | Loading... |
| Jul 6, 2021 | APRE | A | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | Loading... |
| Mar 30, 2021 | E89R | I | TEAS SECTION 8 & 9 RECEIVED | Loading... |
| Jun 4, 2020 | CHAN | I | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | Loading... |
| Jun 4, 2020 | TCCA | I | TEAS CHANGE OF CORRESPONDENCE RECEIVED | Loading... |
| Jun 4, 2020 | ARAA | I | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | Loading... |
| Jun 4, 2020 | REAP | I | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | Loading... |
| Jun 4, 2020 | COAR | I | TEAS CHANGE OF OWNER ADDRESS RECEIVED | Loading... |
| Mar 29, 2020 | REM2 | E | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | Loading... |
| Sep 8, 2017 | NA85 | E | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | Loading... |
| Sep 8, 2017 | C15A | O | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | Loading... |
| Sep 8, 2017 | APRE | A | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | Loading... |
| Aug 2, 2017 | E815 | I | TEAS SECTION 8 & 15 RECEIVED | Loading... |
| Jun 28, 2017 | ASCK | I | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | Loading... |
| Mar 29, 2011 | R.PR | A | REGISTERED-PRINCIPAL REGISTER | Loading... |
| Jan 11, 2011 | NPUB | E | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | Loading... |
| Jan 11, 2011 | PUBO | A | PUBLISHED FOR OPPOSITION | Loading... |
| Dec 9, 2010 | PREV | O | LAW OFFICE PUBLICATION REVIEW COMPLETED | Loading... |
| Dec 8, 2010 | TEME | I | TEAS/EMAIL CORRESPONDENCE ENTERED | Loading... |
| Dec 8, 2010 | CRFA | I | CORRESPONDENCE RECEIVED IN LAW OFFICE | Loading... |
| Dec 8, 2010 | CNSA | O | APPROVED FOR PUB - PRINCIPAL REGISTER | Loading... |
| Dec 8, 2010 | ALIE | A | ASSIGNED TO LIE | Loading... |
| Dec 6, 2010 | PARI | I | TEAS VOLUNTARY AMENDMENT RECEIVED | Loading... |
| Dec 6, 2010 | XAEC | I | EXAMINER'S AMENDMENT ENTERED | Loading... |
| Dec 6, 2010 | GNEN | O | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | Loading... |
| Dec 6, 2010 | GNEA | O | EXAMINERS AMENDMENT E-MAILED | Loading... |
| Dec 6, 2010 | CNEA | R | EXAMINERS AMENDMENT -WRITTEN | Loading... |
| Dec 3, 2010 | GNRN | O | NOTIFICATION OF NON-FINAL ACTION E-MAILED | Loading... |
| Dec 3, 2010 | GNRT | F | NON-FINAL ACTION E-MAILED | Loading... |
| Dec 3, 2010 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
| Dec 2, 2010 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
| Aug 24, 2010 | MDSM | O | NOTICE OF DESIGN SEARCH CODE MAILED | Loading... |
| Aug 23, 2010 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
| Aug 20, 2010 | NWAP | I | NEW APPLICATION ENTERED | Loading... |
Detailed Classifications
Class 040
Assembly of oil and gas, manufacturing, petrochemical and marine industry products for others; custom manufacture of drilling system components and mud tanks for oil, gas, drilling and offshore projects; custom manufacture of pressure vessels; custom manufacture of substructures, namely, box-on-box substructures, slingshot type substructures and telescoping substructures for the oil and gas industry; custom manufacture of subsea equipment, namely, subsea suction piles, driven piles and subsea moorings, mudmats, manifolds, buoyancy cans, in-line sleds, mid-line sleds, tie-in sleds; custom manufacture of power supply systems for drilling rigs, construction sites and portable petrochemical applications; custom manufacture of fluid packaging, dispensing solutions and mobile lubrication equipment for the oil and gas, manufacturing, petrochemical and marine industries
First Use Anywhere:
20010000
First Use in Commerce:
20010000
Class 042
Custom design and engineering of drilling system components, mud tanks, pressure vessels, substructures for the oil and gas industry, subsea equipment, power supply systems and fluid packaging, dispensing solutions and mobile lubrication equipment for the oil and gas, manufacturing, petrochemical and marine industries; testing and research on machines, apparatus and instruments
First Use Anywhere:
20010000
First Use in Commerce:
20010000
Additional Information
Design Mark
The mark consists of the letter "nrg" in black, stylized font directly above the term "MANUFACTURING" in black, stylized font. An abstract design of a red crescent moon shape curves around the top left of the letters "nrg" in the mark. A red, six-pointed star design is directly above the letter "r" in the "nrg" portion of the mark.
Color Claim
The color(s) red and black is/are claimed as a feature of the mark.
Pseudo Mark
ENERGY MANUFACTURING
Classification
International Classes
040
042
Disclaimers
The following terms have been disclaimed and are not claimed as part of the trademark:
Specific Disclaimer
"MANUFACTURING"