Application History
7 events| Date | Code | Type | Description | Documents |
|---|---|---|---|---|
| Jan 8, 2026 | NREP | P | NEW REPRESENTATIVE AT IB RECEIVED | Loading... |
| Dec 31, 2025 | RFCR | E | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | Loading... |
| Dec 30, 2025 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
| Dec 12, 2025 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
| Nov 21, 2025 | MAFR | O | APPLICATION FILING RECEIPT MAILED | Loading... |
| Nov 21, 2025 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
| Nov 20, 2025 | REPR | M | SN ASSIGNED FOR SECT 66A APPL FROM IB | Loading... |
Detailed Classifications
Class 006
Metal building materials for flooring; metal formwork for flooring; metal joints for construction of floors; screed rails made of metal; metal profiles for use in the construction of floors; metal formwork for use in the construction of floors; metal floor joints; metal flooring components; composite metal flooring components; steel flooring components; steel decking components; parts and fittings for the aforesaid.
Class 019
Flooring not of metal; Non-metallic screed rails; non-metallic building materials for flooring; concrete screed rails; cementitious floor coatings; non-metal flooring joints; non-metal flooring components; parts and fittings for the aforesaid.
Class 037
Construction, repair, installation and maintenance of floors and flooring systems; Concrete sealing services; floor curing services; floor sealing services.
Additional Information
Pseudo Mark
PRO GUARD JOINT
Classification
International Classes
006
019
037