Application History
9 events| Date | Code | Type | Description | Documents |
|---|---|---|---|---|
| Oct 3, 2025 | RFNT | P | REFUSAL PROCESSED BY IB | Loading... |
| Sep 17, 2025 | RFCS | P | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | Loading... |
| Sep 16, 2025 | RFRR | P | REFUSAL PROCESSED BY MPU | Loading... |
| Aug 7, 2025 | RFCR | E | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | Loading... |
| Aug 6, 2025 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
| Aug 5, 2025 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
| Apr 28, 2025 | MAFR | O | APPLICATION FILING RECEIPT MAILED | Loading... |
| Apr 28, 2025 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
| Apr 24, 2025 | REPR | M | SN ASSIGNED FOR SECT 66A APPL FROM IB | Loading... |
Detailed Classifications
Class 007
Moving and handling equipment; hydraulic machines and apparatus; hydraulic tools; hydraulic power tools; hydraulic jacks; hydraulic lifts; hydraulic pumps; hydraulic power transmission units (other than for land vehicles); power operated jacks; power operated pumps; parts and fittings for all the aforesaid goods.
Classification
International Classes
007