USPTO Deadlines
Next Deadline
41 days remaining
Non-Final Action Mailed
Due Date
September 12, 2025
Extension Available
Until December 12, 2025
Application History
6 eventsDate | Code | Type | Description | Documents |
---|---|---|---|---|
Jun 13, 2025 | RFCR | E | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | Loading... |
Jun 12, 2025 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
Jun 10, 2025 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
Mar 19, 2025 | MAFR | O | APPLICATION FILING RECEIPT MAILED | Loading... |
Mar 19, 2025 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
Mar 13, 2025 | REPR | M | SN ASSIGNED FOR SECT 66A APPL FROM IB | Loading... |
Detailed Classifications
Class 012
Power transmission belts for land vehicles; power transmission belts for snow mobiles; power transmission belts for all terrain vehicles
Additional Information
Design Mark
The mark consists of the words "PEAK ATTACK" and two hook-shaped figures placed on either side of the mark; the word "PEAK" is written in bold black Gothic font, while "ATTACK," positioned to its right, features a gradient shading that transitions from blue gray at the top to gray at the bottom; the hook on the left is oriented with its shank pointing downward and its opening facing right, overlapping the "P" in "PEAK" at its bend; the hook on the right is larger, oriented with its shank pointing upward and its opening facing left, overlapping the "K" in "ATTACK" at its bend; the two hook-shaped figures on either side are predominantly gray, with the left and right ends being the darkest gray; the color transitions to a lighter gray around the middle of each figure and shifts to a blue gray gradient toward their shanks.
Color Claim
The colors black, gray, and blue gray are claimed as a feature of the mark.
Pseudo Mark
PEAK ATTACK
Classification
International Classes
012