Legal Representation
Attorney
Danielle K. Munoz
USPTO Deadlines
Next Deadline
2126 days remaining
Section 71 Declaration Due (Principal Register 66a) (Based on registration date 20251202)
Due Date
December 02, 2031
Grace Period Ends
June 02, 2032
Additional deadlines exist. Contact your attorney for complete deadline information.
Application History
20 events| Date | Code | Type | Description | Documents |
|---|---|---|---|---|
| Dec 2, 2025 | NRCC | E | NOTICE OF REGISTRATION CONFIRMATION EMAILED | Loading... |
| Dec 2, 2025 | R.PR | A | REGISTERED-PRINCIPAL REGISTER | Loading... |
| Nov 20, 2025 | ADCH | M | CHANGE OF NAME/ADDRESS REC'D FROM IB | Loading... |
| Oct 14, 2025 | NPUB | E | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | Loading... |
| Oct 14, 2025 | PUBO | A | PUBLISHED FOR OPPOSITION | Loading... |
| Oct 8, 2025 | NONP | E | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | Loading... |
| Sep 16, 2025 | CNSA | O | APPROVED FOR PUB - PRINCIPAL REGISTER | Loading... |
| May 7, 2025 | TEME | I | TEAS/EMAIL CORRESPONDENCE ENTERED | Loading... |
| May 6, 2025 | CRFA | I | CORRESPONDENCE RECEIVED IN LAW OFFICE | Loading... |
| May 6, 2025 | TROA | I | TEAS RESPONSE TO OFFICE ACTION RECEIVED | Loading... |
| Mar 22, 2025 | RFNT | P | REFUSAL PROCESSED BY IB | Loading... |
| Mar 5, 2025 | RFCS | P | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | Loading... |
| Mar 5, 2025 | RFRR | P | REFUSAL PROCESSED BY MPU | Loading... |
| Jan 16, 2025 | RFCR | E | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | Loading... |
| Jan 15, 2025 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
| Dec 31, 2024 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
| Dec 30, 2024 | MAFR | O | APPLICATION FILING RECEIPT MAILED | Loading... |
| Dec 30, 2024 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
| Dec 23, 2024 | LIMI | I | LIMITATION FROM ORIGINAL APPLICATION ENTERED | Loading... |
| Dec 5, 2024 | REPR | M | SN ASSIGNED FOR SECT 66A APPL FROM IB | Loading... |
Detailed Classifications
Class 009
Solar cells for electricity generation; photovoltaic solar modules for production of electricity; solar wafers; solar panels for the production of electricity; accumulators for photovoltaic power; crystalline silicon solar power cells; photovoltaic modules for generating electricity; photovoltaic apparatus and installations for generating solar electricity, namely photovoltaic solar modules for production of electricity; photovoltaic installations for generating electricity namely photovoltaic solar modules for production of electricity; apparatus and instruments for the supervision, remote control, checking and measuring of electricity and energy consumption for the operation of power stations, namely electronic monitors for monitoring electric current and electrical signals; electric cables and transformers for the distribution and production of electricity and energy; data processing equipment and recorded computer operating programs for use in the production, distribution and checking of energy and electricity; solar batteries for generating electricity and energy; solar cells for the production of electricity; surveying instruments; time detectors and alarm installations for industrial purposes and for use in energy production and distribution; electric circuits for solar cells and elements; measuring, control and regulating systems for converting electricity, consisting of computer hardware and recorded operating software sold as a unit; inverters for photovoltaic applications; recorded software for the data visualisation of photovoltaic and solar installations; recorded software for simulating photovoltaic and solar installations; automatic solar tracking sensors and replacement parts therefor.
Additional Information
Pseudo Mark
TECCCONNECT
Classification
International Classes
009