Legal Representation
Attorney
Ronni S. Jillions
USPTO Deadlines
Next Deadline
2051 days remaining
Section 8 (6-Year) Declaration Due (Based on registration date 2025-06-24)
Due Date
June 24, 2031
Grace Period Ends
December 24, 2031
Additional deadlines exist. Contact your attorney for complete deadline information.
Application History
19 events| Date | Code | Type | Description | Documents |
|---|---|---|---|---|
| Sep 24, 2025 | FICR | P | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | Loading... |
| Jun 24, 2025 | NRCC | E | NOTICE OF REGISTRATION CONFIRMATION EMAILED | Loading... |
| Jun 24, 2025 | R.PR | A | REGISTERED-PRINCIPAL REGISTER | Loading... |
| May 6, 2025 | NPUB | E | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | Loading... |
| May 6, 2025 | PUBO | A | PUBLISHED FOR OPPOSITION | Loading... |
| Apr 30, 2025 | NONP | E | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | Loading... |
| Apr 5, 2025 | CNSA | O | APPROVED FOR PUB - PRINCIPAL REGISTER | Loading... |
| Mar 20, 2025 | TEME | I | TEAS/EMAIL CORRESPONDENCE ENTERED | Loading... |
| Mar 20, 2025 | CRFA | I | CORRESPONDENCE RECEIVED IN LAW OFFICE | Loading... |
| Mar 20, 2025 | TROA | I | TEAS RESPONSE TO OFFICE ACTION RECEIVED | Loading... |
| Mar 1, 2025 | RFNT | P | REFUSAL PROCESSED BY IB | Loading... |
| Feb 13, 2025 | RFRR | P | REFUSAL PROCESSED BY MPU | Loading... |
| Feb 13, 2025 | RFCS | P | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | Loading... |
| Jan 5, 2025 | RFCR | E | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | Loading... |
| Jan 4, 2025 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
| Dec 16, 2024 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
| Nov 22, 2024 | MAFR | O | APPLICATION FILING RECEIPT MAILED | Loading... |
| Nov 22, 2024 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
| Nov 21, 2024 | REPR | M | SN ASSIGNED FOR SECT 66A APPL FROM IB | Loading... |
Detailed Classifications
Class 009
Transformers; housings for transformers
Class 037
Maintenance of transformers
Additional Information
Design Mark
The mark consists of the wording "H2 TRANSFORMING TOGETHER THE FUTURE OF ENERGY" in a stylized font. The wording "TRANSFORMING TOGETHER THE FUTURE OF" is in a stylized blue font and the wording "ENERGY" is in a stylized orange font. This wording is below a stylized design. Starting on the left, the stylized design consists of three blue shapes that look like tanks with rounded tops. One of the tanks has the wording "H2" on it in blue. To the right are two stylized turbines in blue. Next there is a blue rectangle with two circles inside it. Next there is a stylized building outlined in blue with three blue circles, and a blue flower on it. In front of the building it a blue battery and to the right of that is a blue gear wheel with a lighting bolt cut out of it. There is another building to the right with a zigzag shape on the top and an orange lighting bolt above it. Next there are two transmission towers in blue and orange and connected by lines and squares. Next there is a box outlined in blue with two smaller rectangles inside it. To the right is a blue building with a zigzag shape and blue smoke coming out of it. To the right is aa blue charging station with a blue lightning bolt on it that is plugged into a blue car with an orange hose. Finally, there is a blue house at the end of the design with a blue rectangle next to it with two smaller blue rectangles in it and a stylized design on the front. There are blue and orange lines connecting all the design elements. The color white represents background only and is not being claimed as a feature of the mark.
Color Claim
The color(s) blue and orange is/are claimed as a feature of the mark.
Pseudo Mark
HYDROGEN TRANSFORMING TOGETHER THE FUTURE OF ENERGY
Classification
International Classes
009
037
Disclaimers
The following terms have been disclaimed and are not claimed as part of the trademark:
Specific Disclaimer
"H2"