Legal Representation
Attorney
Robert S. Broder
USPTO Deadlines
Next Deadline
1899 days remaining
Section 71 Declaration Due (Principal Register 66a) (Based on registration date 20250311)
Due Date
March 11, 2031
Grace Period Ends
September 11, 2031
Additional deadlines exist. Contact your attorney for complete deadline information.
Application History
32 events| Date | Code | Type | Description | Documents |
|---|---|---|---|---|
| Oct 10, 2025 | FINO | P | FINAL DECISION TRANSACTION PROCESSED BY IB | Loading... |
| Sep 24, 2025 | FICS | P | FINAL DISPOSITION NOTICE SENT TO IB | Loading... |
| Sep 23, 2025 | FIMP | P | FINAL DISPOSITION PROCESSED | Loading... |
| Aug 22, 2025 | OPNX | P | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | Loading... |
| Aug 14, 2025 | NREP | P | NEW REPRESENTATIVE AT IB RECEIVED | Loading... |
| Aug 6, 2025 | OPNS | P | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | Loading... |
| Aug 6, 2025 | OPNR | P | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | Loading... |
| Jun 12, 2025 | FICR | P | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | Loading... |
| Mar 11, 2025 | NRCC | E | NOTICE OF REGISTRATION CONFIRMATION EMAILED | Loading... |
| Mar 11, 2025 | R.PR | A | REGISTERED-PRINCIPAL REGISTER | Loading... |
| Jan 21, 2025 | NPUB | E | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | Loading... |
| Jan 21, 2025 | PUBO | A | PUBLISHED FOR OPPOSITION | Loading... |
| Jan 15, 2025 | NONP | E | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | Loading... |
| Dec 3, 2024 | PBCR | Z | WITHDRAWN FROM PUB - OG REVIEW QUERY | Loading... |
| Nov 18, 2024 | CNSA | O | APPROVED FOR PUB - PRINCIPAL REGISTER | Loading... |
| Nov 18, 2024 | XAEC | I | EXAMINER'S AMENDMENT ENTERED | Loading... |
| Nov 18, 2024 | GNEN | O | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | Loading... |
| Nov 18, 2024 | GNEA | F | EXAMINERS AMENDMENT E-MAILED | Loading... |
| Nov 18, 2024 | CNEA | R | EXAMINERS AMENDMENT -WRITTEN | Loading... |
| Oct 24, 2024 | TEME | I | TEAS/EMAIL CORRESPONDENCE ENTERED | Loading... |
| Oct 24, 2024 | CRFA | I | CORRESPONDENCE RECEIVED IN LAW OFFICE | Loading... |
| Oct 24, 2024 | TROA | I | TEAS RESPONSE TO OFFICE ACTION RECEIVED | Loading... |
| Aug 17, 2024 | RFNT | P | REFUSAL PROCESSED BY IB | Loading... |
| Jul 30, 2024 | RFCS | P | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | Loading... |
| Jul 30, 2024 | RFRR | P | REFUSAL PROCESSED BY MPU | Loading... |
| Jul 4, 2024 | RFCR | E | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | Loading... |
| Jul 3, 2024 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
| Jul 2, 2024 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
| Apr 24, 2024 | MAFR | O | APPLICATION FILING RECEIPT MAILED | Loading... |
| Mar 12, 2024 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
| Mar 7, 2024 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
| Mar 7, 2024 | REPR | M | SN ASSIGNED FOR SECT 66A APPL FROM IB | Loading... |
Detailed Classifications
Class 007
Steam traps and condensate collectors, namely, steam cleaning machines; valves as parts of machinery, in particular inlet valves, outlet valves, overflow valves, quick-closing and shut-off valves, diverter valves, safety valves, start-up valves, recirculation valves, circulation valves, injection valves, level control valves, minimum flow valves, condensate valves and drain valves; control valves as parts of machinery for pressure reduction, for cooling, whether or not with injection; pressure controls in the nature of pressure regulators as parts of machinery; electric, hydraulic, pneumatic actuators for fittings or valves as parts of machinery; fittings for steam power stations in the form of high pressure bypass valves being parts of machines and medium pressure and low pressure bypass valves being parts of machines; fittings for steam power stations in the form of high pressure bypass valves being parts of machines; filters as parts of machinery; filter silencers for machines; all aforementioned goods for the power plant sector.
Class 009
Control and regulating apparatus for liquid or gaseous media and vapors, namely, control valves for regulating the flow of gases and liquids; controllers, in particular temperature controllers for monitoring the temperature of gases and liquids; measuring instruments, in particular temperature measuring instruments or pressure measuring instruments; electrohydraulic safety valve controllers in the nature of control valves for regulating the flow of gases and liquids; electric rotary actuators; downloadable monitoring software, including mobile apps, for metrological recording, transmission, processing and evaluation of data, in particular in the field of condition monitoring and predictive maintenance of power plant components; all the aforementioned goods for liquid or gaseous media and vapors and for the power plant sector.
Class 011
Flow-through fittings or pipeline fittings as collectors or distributors or for mixing liquid or gaseous media and vapors, namely, thermostatic mixing valves; fittings for pressure reduction, namely, pressure regulators for water installations; valves being plumbing fittings as parts of heating systems, in particular inlet valves, drain valves, overflow valves, quick-closing and shut-off valves, diverter valves, safety valves, start-up valves, circulation valves, injection valves, level control valves, minimum quantity valves, condensate valves and drain valves; control valves being plumbing fittings as parts of heating installations for pressure reduction, for cooling, also with injection; cooling apparatus, devices, units and elements for steam and hydraulic fluids, in particular superheated steam coolers being evaporative air coolers, injection coolers being evaporative air coolers, spray coolers being evaporative air coolers; water filters for exhaust gases and for liquids; all the aforementioned goods for liquid or gaseous media and vapors and for the power plant sector.
Class 042
Engineering services in the field of power plant technology, namely, project planning, product development and design of customized components for power plant technology; performance of technical tests being engineering services; calibration; creation of computer programs for data processing; preparation of technical expert reports being engineering services; material testing; product quality testing; technical engineering consulting; technical engineering services in the fields of condition monitoring and predictive maintenance of power plant components; software as a service [SaaS] services and platform as a service [PaaS] services featuring computer software and computer software platforms for operating machinery in the power plant sector.
Additional Information
Design Mark
The mark consists of a red circle housing a white design of the letters "WT" next to the wording "WELLAND POWER AND ENERGY" in black.
Color Claim
The colors red, white, and black are claimed as a feature of the mark.
Classification
International Classes
007
009
011
042
Disclaimers
The following terms have been disclaimed and are not claimed as part of the trademark:
Specific Disclaimer
"POWER AND ENERGY"