Legal Representation
Attorney
Anthony P Venturino
USPTO Deadlines
Next Deadline
2044 days remaining
Section 8 (6-Year) Declaration Due (Based on registration date 2025-02-18)
Due Date
February 18, 2031
Grace Period Ends
August 18, 2031
Additional deadlines exist. Contact your attorney for complete deadline information.
Application History
28 eventsDate | Code | Type | Description | Documents |
---|---|---|---|---|
May 19, 2025 | FICR | P | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | Loading... |
Feb 18, 2025 | NRCC | E | NOTICE OF REGISTRATION CONFIRMATION EMAILED | Loading... |
Feb 18, 2025 | R.PR | A | REGISTERED-PRINCIPAL REGISTER | Loading... |
Jan 29, 2025 | CORR | I | CORRECTION FROM IB ENTERED - NO REVIEW REQUIRED | Loading... |
Dec 31, 2024 | NPUB | E | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | Loading... |
Dec 31, 2024 | PUBO | A | PUBLISHED FOR OPPOSITION | Loading... |
Dec 25, 2024 | NONP | E | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | Loading... |
Dec 3, 2024 | XAEC | I | EXAMINER'S AMENDMENT ENTERED | Loading... |
Dec 3, 2024 | GNEA | F | EXAMINERS AMENDMENT E-MAILED | Loading... |
Dec 3, 2024 | GNEN | O | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | Loading... |
Dec 3, 2024 | CNEA | R | EXAMINERS AMENDMENT -WRITTEN | Loading... |
Dec 3, 2024 | CNSA | O | APPROVED FOR PUB - PRINCIPAL REGISTER | Loading... |
Nov 5, 2024 | CNFR | R | FINAL REFUSAL WRITTEN | Loading... |
Nov 5, 2024 | GNFR | O | FINAL REFUSAL E-MAILED | Loading... |
Nov 5, 2024 | GNFN | O | NOTIFICATION OF FINAL REFUSAL EMAILED | Loading... |
Oct 17, 2024 | TEME | I | TEAS/EMAIL CORRESPONDENCE ENTERED | Loading... |
Oct 16, 2024 | TROA | I | TEAS RESPONSE TO OFFICE ACTION RECEIVED | Loading... |
Oct 16, 2024 | CRFA | I | CORRESPONDENCE RECEIVED IN LAW OFFICE | Loading... |
Sep 29, 2024 | CRCV | M | CORRECTION TRANSACTION RECEIVED FROM IB | Loading... |
Jul 15, 2024 | RFNT | P | REFUSAL PROCESSED BY IB | Loading... |
Jun 27, 2024 | RFCS | P | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | Loading... |
Jun 27, 2024 | RFRR | P | REFUSAL PROCESSED BY MPU | Loading... |
Jun 14, 2024 | RFCR | E | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | Loading... |
May 28, 2024 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
May 23, 2024 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
Feb 20, 2024 | MAFR | O | APPLICATION FILING RECEIPT MAILED | Loading... |
Feb 16, 2024 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
Feb 15, 2024 | REPR | M | SN ASSIGNED FOR SECT 66A APPL FROM IB | Loading... |
Detailed Classifications
Class 009
Electric cables; optical cables; fibre optics; underwater power cables; underwater optical cables; electrical terminations for cables; transformers; multiplexers; umbilical cables, namely specialized cables for the transport of electricity and data together with fluids; electrical switches; modems; optical switches; main grids and grid stations for the production and supply of electric energy including electric energy supply networks, namely, electricity distribution consoles; apparatus and instruments for the supervision, remote control, control and measurement of electricity and energy consumption and for the automatic functioning of power generating plants, namely, electrical and optical current sensors, electrical and optical voltage sensors, electrical and optical current volume gauges; electrical connectors; fiber optical connectors; transformers for the supply of electricity and energy; data processing apparatus; solar cells and solar batteries for the generation of electricity and energy; electronic earth monitoring instruments, namely, electrical conductivity monitor for monitoring conductor ampacity in transmission lines; electric sensors and alarm installations for industrial purposes and for use in the generation and supply of energy; telecommunication base stations; fiber optic transceivers; telecommunications equipment, namely fiber optic repeaters; fiber optic connectors; telecommunications equipment, namely fiber optic optimizers; fiber optic interconnection cable; fiber optic couplings; fiber optic cable modems; optical fiber telecommunications apparatus, namely, optical fiber cables; junction sleeves for fiber optics; protective sheaths for fiber optical cables
Class 037
Building construction and repair; Construction and repair of electrical systems, and electric power lines; Construction and repair of underwater electric power lines; Construction and repair of underwater fiber optic lines; construction and repair of pipelines, Construction and repair of pumps; construction and repair for electric and fiber optic cables; construction and repair of power plants and power stations; construction and repair of electric energy supply networks hardware and apparatus; laying of cables; laying of underwater cables; laying of underground cables; installation of telephone cables; laying of land cables; installation of hardware and cables for internet access
Class 038
Telecommunication services, namely, telecommunications consultation
Class 039
Distribution and transmission of electricity
Additional Information
Design Mark
The mark consists of a substantially circular line comprised of a line fading from green to blue as it goes up and to the right and with the left vertical element of the circle straightened and with an open lower side, below which is a horizontal blue line placed below the opening.
Color Claim
The color(s) green and blue is/are claimed as a feature of the mark.
Classification
International Classes
009
037
038
039