Legal Representation
Attorney
Corey M. Beaubien
USPTO Deadlines
Next Deadline
1621 days remaining
Section 71 Declaration Due (Principal Register 66a) (Based on registration date 20240709)
Due Date
July 09, 2030
Grace Period Ends
January 09, 2031
Additional deadlines exist. Contact your attorney for complete deadline information.
Application History
29 events| Date | Code | Type | Description | Documents |
|---|---|---|---|---|
| Jan 5, 2025 | FINO | P | FINAL DECISION TRANSACTION PROCESSED BY IB | Loading... |
| Dec 16, 2024 | FICS | P | FINAL DISPOSITION NOTICE SENT TO IB | Loading... |
| Dec 16, 2024 | FIMP | P | FINAL DISPOSITION PROCESSED | Loading... |
| Oct 9, 2024 | FICR | P | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | Loading... |
| Jul 9, 2024 | NRCC | E | NOTICE OF REGISTRATION CONFIRMATION EMAILED | Loading... |
| Jul 9, 2024 | R.PR | A | REGISTERED-PRINCIPAL REGISTER | Loading... |
| Jun 10, 2024 | OPNR | P | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | Loading... |
| Apr 23, 2024 | NPUB | E | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | Loading... |
| Apr 23, 2024 | GPNX | P | NOTIFICATION PROCESSED BY IB | Loading... |
| Apr 23, 2024 | PUBO | A | PUBLISHED FOR OPPOSITION | Loading... |
| Apr 3, 2024 | OPNS | P | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | Loading... |
| Apr 3, 2024 | NONP | E | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | Loading... |
| Apr 3, 2024 | OP2R | P | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | Loading... |
| Mar 12, 2024 | CNSA | O | APPROVED FOR PUB - PRINCIPAL REGISTER | Loading... |
| Feb 15, 2024 | TEME | I | TEAS/EMAIL CORRESPONDENCE ENTERED | Loading... |
| Feb 15, 2024 | CRFA | I | CORRESPONDENCE RECEIVED IN LAW OFFICE | Loading... |
| Feb 15, 2024 | TROA | I | TEAS RESPONSE TO OFFICE ACTION RECEIVED | Loading... |
| Sep 4, 2023 | RFNT | P | REFUSAL PROCESSED BY IB | Loading... |
| Aug 15, 2023 | RFCS | P | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | Loading... |
| Aug 15, 2023 | RFRR | P | REFUSAL PROCESSED BY MPU | Loading... |
| Jul 11, 2023 | RFCR | E | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | Loading... |
| Jul 10, 2023 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
| Jul 8, 2023 | RFWR | P | NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW | Loading... |
| May 27, 2023 | RFCR | E | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | Loading... |
| May 26, 2023 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
| May 23, 2023 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
| Jan 17, 2023 | MAFR | O | APPLICATION FILING RECEIPT MAILED | Loading... |
| Jan 13, 2023 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
| Jan 12, 2023 | REPR | M | SN ASSIGNED FOR SECT 66A APPL FROM IB | Loading... |
Detailed Classifications
Class 007
Couplings for machines and parts thereof; gear boxes for machines and various parts therefor; gears for machines, not for land vehicles, in particular gears for mills; electric drive motors for mills; wind turbines; electricity generators; wind-powered electricity generators; gear boxes, other than for land vehicles; gear box casings, other than for land vehicles; motors, other than for land vehicles; brakes for machines; machine parts, namely, safety couplings, torque limiting elements for couplings; cam sprockets; belt pulleys being parts of machines; transmission chains for power machinery and driving motors and starters therefor, other than for land vehicles; machine parts, namely, transmission link chains, transmission link chains for continuously adjustable transmissions, transmissions for machines and belt pulleys being parts of machines, clamping elements for drives in the nature of chain drives and belt drives, chain clamping elements in the nature of shaft-hub connections and shaft-to-collar connections and shaft-hub joints; timing belts for machines; machine parts, namely, v-belts, conical clamping elements in the nature of shaft-hub connections and shaft-to-collar connections and shaft-hub joints, grain clamping elements in the nature of shaft-hub connections and shaft-to-collar connections and shaft-hub joints, clamping elements in the nature of shaft-hub connections and shaft-to-collar connections and shaft-hub joints for foundation bolts, clamping elements in the nature of shaft-hub connections and shaft-to-collar connections and shaft-hub joints for threads, electromechanical clamping elements in the nature of shaft-hub connections and shaft-to-collar connections and shaft-hub joints, gearboxes; belt pulleys, especially belt pulleys being parts of machines for timing belts and fan belts; engines and motors for machines; brakes for machines; machine parts, in particular axles, cams, linkages in the nature of linkages of metal, cam shafts, cams, grooved pulleys, belt tensioners, friction couplings, magnetic couplings, shaft couplings, brakes and brake linings, coupling and brake operating levers, bearings, bearing caps, standing and hanger bearings, ball-bearings, roller bearings, bevel wheels, worm wheels, frictional wheels, fly-wheels, flywheels, gear drives; machine parts and belts for industrial purposes, in particular, machine belts, v-belts, flat belts, link belts, wide fan belts,
Class 037
Construction, repair and maintenance of wind power installations being structures, in particular generators of electricity and gear boxes.
Additional Information
Pseudo Mark
SECURES
Classification
International Classes
007
037