Legal Representation
Attorney
Cynthia R. Adwere
USPTO Deadlines
Next Deadline
1751 days remaining
Section 8 (6-Year) Declaration Due (Based on registration date 2024-05-07)
Due Date
May 07, 2030
Grace Period Ends
November 07, 2030
Additional deadlines exist. Contact your attorney for complete deadline information.
Application History
36 eventsDate | Code | Type | Description | Documents |
---|---|---|---|---|
Nov 23, 2024 | FINO | P | FINAL DECISION TRANSACTION PROCESSED BY IB | Loading... |
Nov 2, 2024 | FIMP | P | FINAL DISPOSITION PROCESSED | Loading... |
Nov 2, 2024 | FICS | P | FINAL DISPOSITION NOTICE SENT TO IB | Loading... |
Aug 7, 2024 | FICR | P | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | Loading... |
May 7, 2024 | NRCC | E | NOTICE OF REGISTRATION CONFIRMATION EMAILED | Loading... |
May 7, 2024 | R.PR | A | REGISTERED-PRINCIPAL REGISTER | Loading... |
Mar 4, 2024 | NPUB | E | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | Loading... |
Feb 26, 2024 | GPNX | P | NOTIFICATION PROCESSED BY IB | Loading... |
Feb 20, 2024 | PUBO | A | PUBLISHED FOR OPPOSITION | Loading... |
Feb 7, 2024 | OPNS | P | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | Loading... |
Feb 7, 2024 | OP2R | P | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | Loading... |
Jan 31, 2024 | NPUB | E | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | Loading... |
Jan 31, 2024 | NONP | E | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | Loading... |
Jan 12, 2024 | CNSA | O | APPROVED FOR PUB - PRINCIPAL REGISTER | Loading... |
Jan 12, 2024 | XAEC | I | EXAMINER'S AMENDMENT ENTERED | Loading... |
Jan 12, 2024 | GNEN | O | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | Loading... |
Jan 12, 2024 | GNEA | O | EXAMINERS AMENDMENT E-MAILED | Loading... |
Jan 12, 2024 | CNEA | R | EXAMINERS AMENDMENT -WRITTEN | Loading... |
Jan 10, 2024 | TEME | I | TEAS/EMAIL CORRESPONDENCE ENTERED | Loading... |
Jan 9, 2024 | CRFA | I | CORRESPONDENCE RECEIVED IN LAW OFFICE | Loading... |
Jan 9, 2024 | TROA | I | TEAS RESPONSE TO OFFICE ACTION RECEIVED | Loading... |
Dec 8, 2023 | TCCA | I | TEAS CHANGE OF CORRESPONDENCE RECEIVED | Loading... |
Dec 8, 2023 | ECDR | I | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | Loading... |
Dec 8, 2023 | ARAA | I | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | Loading... |
Dec 8, 2023 | REAP | I | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | Loading... |
Dec 8, 2023 | CHAN | I | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | Loading... |
Dec 8, 2023 | COAR | I | TEAS CHANGE OF OWNER ADDRESS RECEIVED | Loading... |
Aug 1, 2023 | RFNT | P | REFUSAL PROCESSED BY IB | Loading... |
Jul 11, 2023 | RFCS | P | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | Loading... |
Jul 11, 2023 | RFRR | P | REFUSAL PROCESSED BY MPU | Loading... |
Jun 3, 2023 | RFCR | E | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | Loading... |
Jun 2, 2023 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
Jun 2, 2023 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
Jan 10, 2023 | MAFR | O | APPLICATION FILING RECEIPT MAILED | Loading... |
Jan 6, 2023 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
Jan 5, 2023 | REPR | M | SN ASSIGNED FOR SECT 66A APPL FROM IB | Loading... |
Detailed Classifications
Class 007
Machines for manufacturing semiconductors; machines for the assembly of semiconductor components; machines for the assembly of semiconductors and integrated circuits; semiconductor wafer processing equipment
Class 009
Apparatus for analysing, inspection and testing of semi-conductors, integrated circuits and chips; component parts of semi-conductors, integrated circuits and chips used in the assembly of semi-conductors, integrated circuits and chips; recorded and downloadable software for analysing, inspection, testing and assembly of semi-conductors, integrated circuits and chips; semiconductor testing apparatus; electronic control systems for machines; testing devices for electronic parts, namely, devices for testing the operability of semiconductor chips; electronic process control instruments, namely, signal conditioning and communication devices for industrial process control; testing apparatus for checking electronic devices, namely, continuity test apparatus for electrical circuits, electronic sound level meters being testing equipment; electrical and electronic test apparatus and instruments; electric measuring devices, namely, clamp meters for measuring electricity; recorded and downloadable factory automation software for integrating manufacturing machine operations, tracking problems and generating production reports
Additional Information
Pseudo Mark
PAR SET
Classification
International Classes
007
009