Legal Representation
Attorney
Melanie I. Rauch
USPTO Deadlines
Next Deadline
1715 days remaining
Section 71 Declaration Due (Principal Register 66a) (Based on registration date 20241022)
Due Date
October 22, 2030
Grace Period Ends
April 22, 2031
Additional deadlines exist. Contact your attorney for complete deadline information.
Application History
32 events| Date | Code | Type | Description | Documents |
|---|---|---|---|---|
| Apr 12, 2025 | FINO | P | FINAL DECISION TRANSACTION PROCESSED BY IB | Loading... |
| Mar 24, 2025 | FICS | P | FINAL DISPOSITION NOTICE SENT TO IB | Loading... |
| Mar 24, 2025 | FIMP | P | FINAL DISPOSITION PROCESSED | Loading... |
| Jan 22, 2025 | FICR | P | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | Loading... |
| Oct 22, 2024 | NRCC | E | NOTICE OF REGISTRATION CONFIRMATION EMAILED | Loading... |
| Oct 22, 2024 | R.PR | A | REGISTERED-PRINCIPAL REGISTER | Loading... |
| Aug 6, 2024 | NPUB | E | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | Loading... |
| Aug 6, 2024 | PUBO | A | PUBLISHED FOR OPPOSITION | Loading... |
| Jul 17, 2024 | NONP | E | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | Loading... |
| Jul 2, 2024 | CNSA | O | APPROVED FOR PUB - PRINCIPAL REGISTER | Loading... |
| Jun 30, 2024 | OPNX | P | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | Loading... |
| Jun 14, 2024 | TEME | I | TEAS/EMAIL CORRESPONDENCE ENTERED | Loading... |
| Jun 14, 2024 | CRFA | I | CORRESPONDENCE RECEIVED IN LAW OFFICE | Loading... |
| Jun 14, 2024 | ALIE | A | ASSIGNED TO LIE | Loading... |
| Jun 7, 2024 | OPNS | P | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | Loading... |
| Jun 7, 2024 | OPNR | P | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | Loading... |
| Feb 28, 2024 | NREV | E | NOTICE OF REVIVAL - E-MAILED | Loading... |
| Feb 28, 2024 | TROA | I | TEAS RESPONSE TO OFFICE ACTION RECEIVED | Loading... |
| Feb 28, 2024 | PETG | O | PETITION TO REVIVE-GRANTED | Loading... |
| Feb 28, 2024 | PROA | I | TEAS PETITION TO REVIVE RECEIVED | Loading... |
| Jan 22, 2024 | MAB2 | O | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | Loading... |
| Jan 22, 2024 | MAB2 | O | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | Loading... |
| Jan 22, 2024 | ABN2 | O | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | Loading... |
| Jul 11, 2023 | RFNT | P | REFUSAL PROCESSED BY IB | Loading... |
| Jun 19, 2023 | RFCS | P | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | Loading... |
| Jun 19, 2023 | RFRR | P | REFUSAL PROCESSED BY MPU | Loading... |
| May 13, 2023 | RFCR | E | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | Loading... |
| May 12, 2023 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
| May 12, 2023 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
| Jan 7, 2023 | MAFR | O | APPLICATION FILING RECEIPT MAILED | Loading... |
| Jan 3, 2023 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
| Dec 30, 2022 | REPR | M | SN ASSIGNED FOR SECT 66A APPL FROM IB | Loading... |
Detailed Classifications
Class 037
Construction of wave-operated energy power plants; construction of energy infrastructure in the field of renewable energies, in
particular in connection with wave, wind and solar power plants; installation of electrical energy installations for renewable
energies, in particular in connection with wave, wind and solar power plants; repair and maintenance of energy generating
installations and energy generating machines, in particular, in relation to the fields of wave power plants, wind based power
plants, and solar power plants; repair and maintenance of energy supply installations and machines, in particular in connection
with wave, wind and solar power plants; installation, repair and maintenance of floating platforms, in particular having photovoltaic
modules, wind-power installations and floating platforms equipped with wave energy conversion modules; installation of floating
maintenance and supply platforms; installation of floating transport, goods and storage platforms; installation of floating platforms
holding electronic and information technology (IT) components, in particular hardware components and devices for data
processing and data exchange; installation of mooring and leisure platforms for mooring boats
Class 042
Scientific research relating to energy, in particular, natural and renewable energy sources; conducting of scientific research and
technical project studies in the field of using natural and renewable energy sources for electric energy supply; design and
development of systems for generating electrical energy and renewable and natural energy sources; design and development of
energy management software; data recording and data evaluation services relating to energy consumption; consultancy in the
field of energy-saving; advisory services relating to the use of energy; advisory services relating to energy efficiency; consultancy
relating to technological services in the field of power and energy supply; provision of information concerning scientific research
and technical project studies relating to the use of natural energy; energy auditing; creation of software programs for the energy
industry; technological consultancy relating to the conservation of energy; technological consultancy relating to energy efficiency
in buildings; providing technical advice relating to energy-saving measures
Classification
International Classes
037
042
Disclaimers
The following terms have been disclaimed and are not claimed as part of the trademark:
Specific Disclaimer
"POWER"