Legal Representation
Attorney
Stewart J. Bellus
USPTO Deadlines
Next Deadline
231 days remaining
Section 8 (6-Year) Declaration Due (Based on registration date 2020-03-10)
Due Date
March 10, 2026
Grace Period Ends
September 10, 2026
Additional deadlines exist. Contact your attorney for complete deadline information.
Application History
29 eventsDate | Code | Type | Description | Documents |
---|---|---|---|---|
Mar 10, 2025 | REM3 | E | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | Loading... |
Aug 14, 2020 | FINO | P | FINAL DECISION TRANSACTION PROCESSED BY IB | Loading... |
Jul 25, 2020 | FIMP | P | FINAL DISPOSITION PROCESSED | Loading... |
Jul 25, 2020 | FICS | P | FINAL DISPOSITION NOTICE SENT TO IB | Loading... |
Jun 10, 2020 | FICR | P | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | Loading... |
Mar 10, 2020 | R.PR | A | REGISTERED-PRINCIPAL REGISTER | Loading... |
Jan 4, 2020 | GPNX | P | NOTIFICATION PROCESSED BY IB | Loading... |
Dec 24, 2019 | NPUB | E | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | Loading... |
Dec 24, 2019 | PUBO | A | PUBLISHED FOR OPPOSITION | Loading... |
Dec 18, 2019 | OPNS | P | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | Loading... |
Dec 18, 2019 | OP2R | P | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | Loading... |
Dec 4, 2019 | NONP | E | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | Loading... |
Nov 20, 2019 | CNSA | O | APPROVED FOR PUB - PRINCIPAL REGISTER | Loading... |
Nov 18, 2019 | TEME | I | TEAS/EMAIL CORRESPONDENCE ENTERED | Loading... |
Nov 18, 2019 | CRFA | I | CORRESPONDENCE RECEIVED IN LAW OFFICE | Loading... |
Nov 18, 2019 | ALIE | A | ASSIGNED TO LIE | Loading... |
Nov 12, 2019 | TROA | I | TEAS RESPONSE TO OFFICE ACTION RECEIVED | Loading... |
Nov 2, 2019 | RFNT | P | REFUSAL PROCESSED BY IB | Loading... |
Sep 29, 2019 | RFCS | P | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | Loading... |
Sep 29, 2019 | RFRR | P | REFUSAL PROCESSED BY MPU | Loading... |
Sep 21, 2019 | RFCR | E | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | Loading... |
Sep 20, 2019 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
Sep 20, 2019 | RFWR | P | NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW | Loading... |
Sep 13, 2019 | MAFR | O | APPLICATION FILING RECEIPT MAILED | Loading... |
Sep 11, 2019 | RFCR | E | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | Loading... |
Sep 10, 2019 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
Sep 9, 2019 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
Sep 9, 2019 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
Aug 29, 2019 | REPR | M | SN ASSIGNED FOR SECT 66A APPL FROM IB | Loading... |
Detailed Classifications
Class 006
Metal building materials, namely, metal modular building units, mounting racks of metal for fixing toilets, mounting racks of metal for fixing of vanity units, mounting racks of metal for fixing of bidets, mounting racks of metal for fixing of urinals, toilet blocks being prefabricated for metal restroom buildings; metal modular building units; support frames of metal for attaching toilets; support frames of metal for attaching washstands; support frames of metal for installing bidets; support frames of metal for installing urinals
Class 011
Sanitary installations in the nature of toilet cisterns, flushing apparatus for urinals, drainage connectors for mounting in mounting racks being parts of sanitary installations; fittings for pipelines in water pipe installations used in the draining of water in sanitary installations
Class 019
Non-metallic building materials, namely, plastic empty rigid pipes, rigid flushing pipes of plastics; sound-absorbing cladding materials for building, not of metal
Additional Information
Translation
The English translation of "PREVISTA" in the mark is "EXPECTED".
Classification
International Classes
006
011
019