Legal Representation
Attorney
Cori A. Stedman
USPTO Deadlines
Next Deadline
In Grace Period
Section 8 (6-Year) Declaration Due (Based on registration date 2019-03-05)
Due Date
March 05, 2025
Grace Period Ends
September 05, 2025
Additional deadlines exist. Contact your attorney for complete deadline information.
Application History
29 eventsDate | Code | Type | Description | Documents |
---|---|---|---|---|
Jul 31, 2025 | NA75 | E | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | Loading... |
Jul 31, 2025 | C75A | O | REGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK. | Loading... |
Jul 28, 2025 | APRE | A | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | Loading... |
May 6, 2025 | ES75 | I | TEAS SECTION 71 & 15 RECEIVED | Loading... |
Sep 13, 2024 | NREP | P | NEW REPRESENTATIVE AT IB RECEIVED | Loading... |
Jul 19, 2019 | FINO | P | FINAL DECISION TRANSACTION PROCESSED BY IB | Loading... |
Jun 29, 2019 | FICS | P | FINAL DISPOSITION NOTICE SENT TO IB | Loading... |
Jun 29, 2019 | FIMP | P | FINAL DISPOSITION PROCESSED | Loading... |
Jun 5, 2019 | FICR | P | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | Loading... |
Mar 5, 2019 | R.PR | A | REGISTERED-PRINCIPAL REGISTER | Loading... |
Dec 18, 2018 | PUBO | A | PUBLISHED FOR OPPOSITION | Loading... |
Dec 15, 2018 | GPNX | P | NOTIFICATION PROCESSED BY IB | Loading... |
Nov 28, 2018 | OPNS | P | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | Loading... |
Nov 28, 2018 | OP2R | P | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | Loading... |
Nov 28, 2018 | NPUB | O | NOTICE OF PUBLICATION | Loading... |
Nov 9, 2018 | ALIE | A | ASSIGNED TO LIE | Loading... |
Oct 26, 2018 | CNSA | O | APPROVED FOR PUB - PRINCIPAL REGISTER | Loading... |
Oct 26, 2018 | CNEA | O | EXAMINERS AMENDMENT MAILED | Loading... |
Oct 26, 2018 | XAEC | I | EXAMINER'S AMENDMENT ENTERED | Loading... |
Oct 26, 2018 | CNEA | R | EXAMINERS AMENDMENT -WRITTEN | Loading... |
Sep 21, 2018 | RFNT | P | REFUSAL PROCESSED BY IB | Loading... |
Sep 5, 2018 | RFCS | P | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | Loading... |
Sep 5, 2018 | RFRR | P | REFUSAL PROCESSED BY MPU | Loading... |
Aug 23, 2018 | RFCR | E | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | Loading... |
Aug 22, 2018 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
Aug 14, 2018 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
Aug 11, 2018 | MAFR | O | APPLICATION FILING RECEIPT MAILED | Loading... |
Aug 7, 2018 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
Aug 2, 2018 | REPR | M | SN ASSIGNED FOR SECT 66A APPL FROM IB | Loading... |
Detailed Classifications
Class 037
Shipbuilding; construction, rebuilding, renovation, repair, and maintenance of ships, watercrafts, and maritime constructions, namely, docks and wharves; installation services in relation to ships, watercraft and maritime constructions, namely, installation of ship engines and docks; services of a shipyard, namely, construction and repair of ships; consultancy and provision of information relating to shipbuilding and rebuilding, renovation, repair and maintenance of ships and watercrafts; renovation of ships, namely, lengthening of ships by inserting of sections; rebuilding and renovation passenger ships, ferries and yachts; renovation of cabins and interiors of passenger ships, ferries and yachts; repair and renovation passenger ships, ferries and yachts, namely, replacement of vessel components including boilers, turbines and motor systems, pumps, motors, and pipelines; all aforesaid services including those provided on moving ships and at offshore facilities; construction, repair, maintenance and installation services for industrial plants and power plants, namely, repair of boilers, reconditioning of industrial machinery, and repair project management in connection therewith; construction project management relating to shipbuilding; construction project management relating to power plant construction
Additional Information
Color Claim
The color(s) blue, white, orange is/are claimed as a feature of the mark.
Translation
The English Translation of the word "WERFT" in the mark is "shipyard"
Other
The mark consists of the wording "LLOYD WERFT" in stylized white font outlined in blue. To the right of the wording are two angled parallel vertical bands in orange and blue.
Classification
International Classes
037
Disclaimers
The following terms have been disclaimed and are not claimed as part of the trademark:
Specific Disclaimer
"WERFT"