Legal Representation
Attorney
Claudia W. Stangle
USPTO Deadlines
Next Deadline
In Grace Period
Section 8 (6-Year) Declaration Due (Based on registration date 2019-02-26)
Due Date
February 26, 2025
Grace Period Ends
August 26, 2025
Additional deadlines exist. Contact your attorney for complete deadline information.
Application History
35 eventsDate | Code | Type | Description | Documents |
---|---|---|---|---|
Jul 22, 2025 | INPR | P | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | Loading... |
Nov 22, 2024 | NA75 | E | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | Loading... |
Nov 22, 2024 | C75P | O | REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK. | Loading... |
Nov 22, 2024 | APRE | A | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | Loading... |
Apr 9, 2024 | ES75 | I | TEAS SECTION 71 & 15 RECEIVED | Loading... |
Feb 26, 2024 | REM3 | E | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | Loading... |
Jan 27, 2024 | NREP | P | NEW REPRESENTATIVE AT IB RECEIVED | Loading... |
Dec 10, 2021 | NREP | P | NEW REPRESENTATIVE AT IB RECEIVED | Loading... |
Jul 12, 2019 | FINO | P | FINAL DECISION TRANSACTION PROCESSED BY IB | Loading... |
Jun 20, 2019 | FICS | P | FINAL DISPOSITION NOTICE SENT TO IB | Loading... |
Jun 20, 2019 | FIMP | P | FINAL DISPOSITION PROCESSED | Loading... |
May 26, 2019 | FICR | P | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | Loading... |
Feb 26, 2019 | R.PR | A | REGISTERED-PRINCIPAL REGISTER | Loading... |
Dec 11, 2018 | NPUB | E | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | Loading... |
Dec 11, 2018 | PUBO | A | PUBLISHED FOR OPPOSITION | Loading... |
Dec 8, 2018 | GPNX | P | NOTIFICATION PROCESSED BY IB | Loading... |
Nov 21, 2018 | OPNS | P | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | Loading... |
Nov 21, 2018 | NONP | E | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | Loading... |
Nov 21, 2018 | OP2R | P | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | Loading... |
Oct 31, 2018 | TEME | I | TEAS/EMAIL CORRESPONDENCE ENTERED | Loading... |
Oct 31, 2018 | CRFA | I | CORRESPONDENCE RECEIVED IN LAW OFFICE | Loading... |
Oct 31, 2018 | ALIE | A | ASSIGNED TO LIE | Loading... |
Oct 31, 2018 | CNSA | O | APPROVED FOR PUB - PRINCIPAL REGISTER | Loading... |
Oct 23, 2018 | TROA | I | TEAS RESPONSE TO OFFICE ACTION RECEIVED | Loading... |
Aug 10, 2018 | NREP | P | NEW REPRESENTATIVE AT IB RECEIVED | Loading... |
Jun 9, 2018 | RFNT | P | REFUSAL PROCESSED BY IB | Loading... |
May 23, 2018 | RFCS | P | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | Loading... |
May 23, 2018 | RFRR | P | REFUSAL PROCESSED BY MPU | Loading... |
May 22, 2018 | MAFR | O | APPLICATION FILING RECEIPT MAILED | Loading... |
May 19, 2018 | MAFR | O | APPLICATION FILING RECEIPT MAILED | Loading... |
May 19, 2018 | RFCR | E | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | Loading... |
May 18, 2018 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
May 15, 2018 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
May 15, 2018 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
May 10, 2018 | REPR | M | SN ASSIGNED FOR SECT 66A APPL FROM IB | Loading... |
Detailed Classifications
Class 009
Supply systems in the form of electricity grids, namely, electricity distribution consoles; solar modules in photovoltaic installations, namely, photovoltaic systems that convert sunlight into electric energy; electrical transformers; generator transformers; distribution transformers; power transformers; regulating transformers; phase-shifting transformers; rectifier transformers; electrical coils; capacitors; accumulators; switching devices, namely, electric switches; de-energized tap changers; on-load tap changers; electric sensors; computers; computer hardware; computer software for monitoring electricity; measuring equipment, namely, rulers; controlling equipment, namely, electric control panels; monitoring equipment for monitoring battery performance characteristics; installations, equipment and computer software for conducting, distributing, switching, converting, storing, influencing and controlling of electricity, namely, electric installations for the remote control of industrial operations; installations, equipment and computer software for influencing, operating, controlling, monitoring and checking of drives, electric motors, wind turbines, wind parks, electric generator transformers, of technical and electrical installations, equipment and devices, of power supply system, electricity grids, solar modules, photovoltaic installations, electrical transformers, electrical coils, capacitors, accumulators, switching devices, tap changers, and sensors, namely, electric installations for the remote control of industrial operations; installations, equipment and computer software for ensuring and improving of the power quality of public, private and industrial power supply system and electricity grids, namely, electric installations for the remote control of industrial operations; installations, equipment and computer software for power factor correction by means of electrical coils and capacitors, and for uninterruptible power supply, namely, electric installations for the remote control of industrial operations; sensors for temperature, filling level, flow, speed, acceleration, mechanical tension, shear, torsion, pressure, moisture, surface radio waves, sound, vibrations, electromagnetic radiation, light, microwaves, electric currents, electric voltage, electric energy, electric power, electric impedance, electric power factor, electric phase shifts and detecting dissolved gas; computer hardware and computer software for evaluating and visualizing of data, information and signals, and for controlling of industrial processes; component parts for the aforesaid goods and in the field of high-voltage technology
Classification
International Classes
009