Legal Representation
Attorney
Montra Yazdani
USPTO Deadlines
Next Deadline
In Grace Period
Section 8 (6-Year) Declaration Due (Based on registration date 2019-03-12)
Due Date
March 12, 2025
Grace Period Ends
September 12, 2025
Additional deadlines exist. Contact your attorney for complete deadline information.
Application History
33 eventsDate | Code | Type | Description | Documents |
---|---|---|---|---|
Jun 18, 2025 | NA71 | E | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | Loading... |
Jun 18, 2025 | 71AG | O | REGISTERED-SEC.71 ACCEPTED | Loading... |
Jun 16, 2025 | APRE | A | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | Loading... |
Mar 3, 2025 | ES71 | I | TEAS SECTION 71 RECEIVED | Loading... |
Jul 19, 2019 | FINO | P | FINAL DECISION TRANSACTION PROCESSED BY IB | Loading... |
Jun 27, 2019 | FICS | P | FINAL DISPOSITION NOTICE SENT TO IB | Loading... |
Jun 27, 2019 | FIMP | P | FINAL DISPOSITION PROCESSED | Loading... |
Jun 12, 2019 | FICR | P | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | Loading... |
Mar 22, 2019 | OPNX | P | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | Loading... |
Mar 12, 2019 | R.PR | A | REGISTERED-PRINCIPAL REGISTER | Loading... |
Mar 6, 2019 | OPNS | P | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | Loading... |
Mar 6, 2019 | OPNR | P | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | Loading... |
Dec 25, 2018 | PUBO | A | PUBLISHED FOR OPPOSITION | Loading... |
Dec 5, 2018 | NPUB | O | NOTICE OF PUBLICATION | Loading... |
Nov 16, 2018 | ALIE | A | ASSIGNED TO LIE | Loading... |
Nov 2, 2018 | CNEA | O | EXAMINERS AMENDMENT MAILED | Loading... |
Nov 2, 2018 | XAEC | I | EXAMINER'S AMENDMENT ENTERED | Loading... |
Nov 2, 2018 | CNSA | O | APPROVED FOR PUB - PRINCIPAL REGISTER | Loading... |
Nov 2, 2018 | CNEA | R | EXAMINERS AMENDMENT -WRITTEN | Loading... |
Apr 6, 2018 | CNFR | O | FINAL REFUSAL MAILED | Loading... |
Apr 5, 2018 | CNFR | R | FINAL REFUSAL WRITTEN | Loading... |
Mar 5, 2018 | TEME | I | TEAS/EMAIL CORRESPONDENCE ENTERED | Loading... |
Mar 5, 2018 | CRFA | I | CORRESPONDENCE RECEIVED IN LAW OFFICE | Loading... |
Mar 5, 2018 | TROA | I | TEAS RESPONSE TO OFFICE ACTION RECEIVED | Loading... |
Dec 15, 2017 | RFNP | P | REFUSAL PROCESSED BY IB | Loading... |
Nov 28, 2017 | RFCS | P | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | Loading... |
Nov 28, 2017 | RFRR | P | REFUSAL PROCESSED BY MPU | Loading... |
Nov 14, 2017 | RFCR | E | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | Loading... |
Nov 13, 2017 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
Nov 8, 2017 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
Oct 10, 2017 | MAFR | O | APPLICATION FILING RECEIPT MAILED | Loading... |
Oct 6, 2017 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
Oct 5, 2017 | REPR | M | SN ASSIGNED FOR SECT 66A APPL FROM IB | Loading... |
Detailed Classifications
Class 009
Remote, electric and electronic control stations for controlling pressure, flow, temperature, speed, torque, dryness, turbidity, vibration and energy; electric control apparatus for controlling pressure, flow, temperature, speed, torque, dryness, turbidity, vibration and energy; digital electronic controllers for controlling pressure, flow, temperature, speed, torque, dryness, turbidity, vibration and energy; electric control devices for energy management; electric power controllers; electric installations for the remote control of industrial operations; electrical control boards for controlling pressure, flow, temperature, speed, torque, dryness, turbidity, vibration and energy; electrical controllers; electrical controls; electronic variable speed controllers; industrial controls incorporating software for controlling pressure, flow, temperature, speed, torque, dryness, turbidity, vibration and energy; industrial process control software; electric monitoring control apparatus for controlling pressure, flow, temperature, speed, torque, dryness, turbidity, vibration and energy; electric process control units for controlling pressure, flow, temperature, speed, torque, dryness, turbidity, vibration and energy; process control digital controllers for controlling pressure, flow, temperature, speed, torque, dryness, turbidity, vibration and energy; electric process controllers for controlling pressure, flow, temperature, speed, torque, dryness, turbidity, vibration and energy; programmable controllers for controlling pressure, flow, temperature, speed, torque, dryness, turbidity, vibration and energy; programmable control apparatus for controlling pressure, flow, temperature, speed, torque, dryness, turbidity, vibration and energy; remote controls for controlling pressure, flow, temperature, speed, torque, dryness, turbidity, vibration and energy; none of the aforementioned goods being actuators, valves or parts of actuators or valves
Classification
International Classes
009