ADDIQ

Serial Number 79217593
Registration 5693914
706

Registration Progress

Application Filed
Aug 8, 2017
Under Examination
Approved for Publication
Dec 5, 2018
Published for Opposition
Dec 25, 2018
Registered
Mar 12, 2019

Attorney Assistance

Section 8 (6-Year) Declaration Due (Based on registration date 2019-03-12) (Grace Period Filing)
Due: Sep 12, 2025 Grace Period - 51 days
Original deadline was Mar 12, 2025 (overdue)

Trademark Image

ADDIQ

Basic Information

Serial Number
79217593
Registration Number
5693914
Filing Date
August 8, 2017
Registration Date
March 12, 2019
Published for Opposition
December 25, 2018
Drawing Code
4

Status Summary

Current Status
Active
Status Code
706
Status Date
Jun 18, 2025
Registration
Registered
Classes
009

Rights Holder

Andritz AG

25
Address
18, Stattegger Strasse
Graz A-8045
AT

Ownership History

Andritz AG

Original Applicant
25
AT

Andritz AG

Owner at Publication
25
AT

Andritz AG

Original Registrant
25
Graz AT

Legal Representation

Attorney
Montra Yazdani

USPTO Deadlines

Next Deadline
In Grace Period
Section 8 (6-Year) Declaration Due (Based on registration date 2019-03-12)
Due Date
March 12, 2025
Grace Period Ends
September 12, 2025
Additional deadlines exist. Contact your attorney for complete deadline information.

Application History

33 events
Date Code Type Description Documents
Jun 18, 2025 NA71 E NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED Loading...
Jun 18, 2025 71AG O REGISTERED-SEC.71 ACCEPTED Loading...
Jun 16, 2025 APRE A CASE ASSIGNED TO POST REGISTRATION PARALEGAL Loading...
Mar 3, 2025 ES71 I TEAS SECTION 71 RECEIVED Loading...
Jul 19, 2019 FINO P FINAL DECISION TRANSACTION PROCESSED BY IB Loading...
Jun 27, 2019 FICS P FINAL DISPOSITION NOTICE SENT TO IB Loading...
Jun 27, 2019 FIMP P FINAL DISPOSITION PROCESSED Loading...
Jun 12, 2019 FICR P FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB Loading...
Mar 22, 2019 OPNX P NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB Loading...
Mar 12, 2019 R.PR A REGISTERED-PRINCIPAL REGISTER Loading...
Mar 6, 2019 OPNS P NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB Loading...
Mar 6, 2019 OPNR P NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB Loading...
Dec 25, 2018 PUBO A PUBLISHED FOR OPPOSITION Loading...
Dec 5, 2018 NPUB O NOTICE OF PUBLICATION Loading...
Nov 16, 2018 ALIE A ASSIGNED TO LIE Loading...
Nov 2, 2018 CNEA O EXAMINERS AMENDMENT MAILED Loading...
Nov 2, 2018 XAEC I EXAMINER'S AMENDMENT ENTERED Loading...
Nov 2, 2018 CNSA O APPROVED FOR PUB - PRINCIPAL REGISTER Loading...
Nov 2, 2018 CNEA R EXAMINERS AMENDMENT -WRITTEN Loading...
Apr 6, 2018 CNFR O FINAL REFUSAL MAILED Loading...
Apr 5, 2018 CNFR R FINAL REFUSAL WRITTEN Loading...
Mar 5, 2018 TEME I TEAS/EMAIL CORRESPONDENCE ENTERED Loading...
Mar 5, 2018 CRFA I CORRESPONDENCE RECEIVED IN LAW OFFICE Loading...
Mar 5, 2018 TROA I TEAS RESPONSE TO OFFICE ACTION RECEIVED Loading...
Dec 15, 2017 RFNP P REFUSAL PROCESSED BY IB Loading...
Nov 28, 2017 RFCS P NON-FINAL ACTION MAILED - REFUSAL SENT TO IB Loading...
Nov 28, 2017 RFRR P REFUSAL PROCESSED BY MPU Loading...
Nov 14, 2017 RFCR E NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW Loading...
Nov 13, 2017 CNRT R NON-FINAL ACTION WRITTEN Loading...
Nov 8, 2017 DOCK D ASSIGNED TO EXAMINER Loading...
Oct 10, 2017 MAFR O APPLICATION FILING RECEIPT MAILED Loading...
Oct 6, 2017 NWOS I NEW APPLICATION OFFICE SUPPLIED DATA ENTERED Loading...
Oct 5, 2017 REPR M SN ASSIGNED FOR SECT 66A APPL FROM IB Loading...

Detailed Classifications

Class 009
Remote, electric and electronic control stations for controlling pressure, flow, temperature, speed, torque, dryness, turbidity, vibration and energy; electric control apparatus for controlling pressure, flow, temperature, speed, torque, dryness, turbidity, vibration and energy; digital electronic controllers for controlling pressure, flow, temperature, speed, torque, dryness, turbidity, vibration and energy; electric control devices for energy management; electric power controllers; electric installations for the remote control of industrial operations; electrical control boards for controlling pressure, flow, temperature, speed, torque, dryness, turbidity, vibration and energy; electrical controllers; electrical controls; electronic variable speed controllers; industrial controls incorporating software for controlling pressure, flow, temperature, speed, torque, dryness, turbidity, vibration and energy; industrial process control software; electric monitoring control apparatus for controlling pressure, flow, temperature, speed, torque, dryness, turbidity, vibration and energy; electric process control units for controlling pressure, flow, temperature, speed, torque, dryness, turbidity, vibration and energy; process control digital controllers for controlling pressure, flow, temperature, speed, torque, dryness, turbidity, vibration and energy; electric process controllers for controlling pressure, flow, temperature, speed, torque, dryness, turbidity, vibration and energy; programmable controllers for controlling pressure, flow, temperature, speed, torque, dryness, turbidity, vibration and energy; programmable control apparatus for controlling pressure, flow, temperature, speed, torque, dryness, turbidity, vibration and energy; remote controls for controlling pressure, flow, temperature, speed, torque, dryness, turbidity, vibration and energy; none of the aforementioned goods being actuators, valves or parts of actuators or valves

Classification

International Classes
009