TUBETEX

Serial Number 79214869
Registration 5766261
700

Registration Progress

Application Filed
Apr 10, 2017
Under Examination
Approved for Publication
Mar 19, 2019
Published for Opposition
Mar 19, 2019
Registered
Jun 4, 2019

Attorney Assistance

Section 8 (6-Year) Declaration Due (Based on registration date 2019-06-04) (Grace Period Filing)
Due: Dec 04, 2025 Grace Period - 136 days
Original deadline was Jun 04, 2025 (overdue)

Trademark Image

TUBETEX

Basic Information

Serial Number
79214869
Registration Number
5766261
Filing Date
April 10, 2017
Registration Date
June 4, 2019
Published for Opposition
March 19, 2019
Drawing Code
4

Status Summary

Current Status
Active
Status Code
700
Status Date
Jun 4, 2019
Registration
Registered
Classes
042

Rights Holder

NordiTube Technologies SE

94
Address
Rue Ernest Solvay 181
B-4000 Liège
BE

Ownership History

SEKISUI Norditube Technologies

Original Applicant
99
Schieder-Schwalenberg DE

SEKISUI Norditube Technologies

Owner at Publication
99
Schieder-Schwalenberg DE

NordiTube Technologies SE

Original Registrant
94
BE

Legal Representation

Attorney
Neil F. Greenblum

USPTO Deadlines

Next Deadline
In Grace Period
Section 8 (6-Year) Declaration Due (Based on registration date 2019-06-04)
Due Date
June 04, 2025
Grace Period Ends
December 04, 2025
Additional deadlines exist. Contact your attorney for complete deadline information.

Application History

45 events
Date Code Type Description Documents
Jun 4, 2024 REM3 E COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED Loading...
Oct 2, 2020 ADCH M CHANGE OF NAME/ADDRESS REC'D FROM IB Loading...
Oct 18, 2019 FINO P FINAL DECISION TRANSACTION PROCESSED BY IB Loading...
Sep 13, 2019 FICS P FINAL DISPOSITION NOTICE SENT TO IB Loading...
Sep 13, 2019 FIMP P FINAL DISPOSITION PROCESSED Loading...
Sep 4, 2019 FICR P FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB Loading...
Jun 4, 2019 R.PR A REGISTERED-PRINCIPAL REGISTER Loading...
Mar 19, 2019 PUBO A PUBLISHED FOR OPPOSITION Loading...
Mar 19, 2019 NPUB E OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED Loading...
Feb 27, 2019 OPNS P NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB Loading...
Feb 27, 2019 NONP E NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED Loading...
Feb 27, 2019 OP2R P NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB Loading...
Feb 15, 2019 OPNX P NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB Loading...
Feb 14, 2019 PREV O LAW OFFICE PUBLICATION REVIEW COMPLETED Loading...
Feb 12, 2019 CNSA O APPROVED FOR PUB - PRINCIPAL REGISTER Loading...
Feb 12, 2019 TEME I TEAS/EMAIL CORRESPONDENCE ENTERED Loading...
Feb 12, 2019 CRFA I CORRESPONDENCE RECEIVED IN LAW OFFICE Loading...
Feb 6, 2019 ERSI I TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED Loading...
Jan 30, 2019 OPNS P NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB Loading...
Jan 30, 2019 OPNR P NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB Loading...
Sep 18, 2018 GNS3 O NOTIFICATION OF LETTER OF SUSPENSION E-MAILED Loading...
Sep 18, 2018 GNSL S LETTER OF SUSPENSION E-MAILED Loading...
Sep 18, 2018 CNSL R SUSPENSION LETTER WRITTEN Loading...
Sep 17, 2018 TEME I TEAS/EMAIL CORRESPONDENCE ENTERED Loading...
Sep 17, 2018 CRFA I CORRESPONDENCE RECEIVED IN LAW OFFICE Loading...
Sep 17, 2018 ALIE A ASSIGNED TO LIE Loading...
Sep 7, 2018 ERFR I TEAS REQUEST FOR RECONSIDERATION RECEIVED Loading...
Mar 9, 2018 GNFN O NOTIFICATION OF FINAL REFUSAL EMAILED Loading...
Mar 9, 2018 GNFR O FINAL REFUSAL E-MAILED Loading...
Mar 9, 2018 CNFR R FINAL REFUSAL WRITTEN Loading...
Mar 8, 2018 TEME I TEAS/EMAIL CORRESPONDENCE ENTERED Loading...
Mar 7, 2018 CRFA I CORRESPONDENCE RECEIVED IN LAW OFFICE Loading...
Mar 7, 2018 TROA I TEAS RESPONSE TO OFFICE ACTION RECEIVED Loading...
Mar 7, 2018 ARAA I ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED Loading...
Mar 7, 2018 REAP I TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED Loading...
Sep 22, 2017 RFNT P REFUSAL PROCESSED BY IB Loading...
Sep 7, 2017 RFCS P NON-FINAL ACTION MAILED - REFUSAL SENT TO IB Loading...
Sep 7, 2017 RFRR P REFUSAL PROCESSED BY MPU Loading...
Sep 5, 2017 MAFR O APPLICATION FILING RECEIPT MAILED Loading...
Sep 2, 2017 RFCR E NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW Loading...
Sep 1, 2017 CNRT R NON-FINAL ACTION WRITTEN Loading...
Aug 31, 2017 DOCK D ASSIGNED TO EXAMINER Loading...
Aug 31, 2017 NWOS I NEW APPLICATION OFFICE SUPPLIED DATA ENTERED Loading...
Aug 25, 2017 LIMI I LIMITATION FROM ORIGINAL APPLICATION ENTERED Loading...
Aug 24, 2017 REPR M SN ASSIGNED FOR SECT 66A APPL FROM IB Loading...

Detailed Classifications

Class 042
Scientific analysis and scientific research services in the field of water and gas pipes; pipeline inspection services; design of pipelines; technical design and planning of pipelines for gas, water and waste water; technical scientific research services in the field of water and gas pipes; engineering services in the field of water and gas pipes; engineering surveying; construction drafting; calibration in the nature of measuring; consultancy in the field of designing energy-saving pipelines; inspection services for pipeworks for the purposes of repair; engineering drawing services; civil engineering consultancy

Additional Information

Pseudo Mark
TUBE TEXTURE

Classification

International Classes
042