Legal Representation
Attorney
W. R. Duke Taylor/Jessica S. Sachs
USPTO Deadlines
Next Deadline
1753 days remaining
Section 71 Renewal Due (Principal Register 66a) (Based on registration date 20101012)
Due Date
October 12, 2030
Grace Period Ends
April 12, 2031
Application History
42 events| Date | Code | Type | Description | Documents |
|---|---|---|---|---|
| Apr 11, 2025 | NREP | P | NEW REPRESENTATIVE AT IB RECEIVED | Loading... |
| Sep 4, 2022 | INNP | P | PARTIAL INVALIDATION PROCESSED BY THE IB | Loading... |
| Jul 25, 2022 | INPS | P | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | Loading... |
| Jul 25, 2022 | INPC | P | INVALIDATION PROCESSED | Loading... |
| Apr 13, 2022 | INPR | P | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | Loading... |
| Aug 13, 2021 | NA71 | E | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | Loading... |
| Aug 13, 2021 | 71AG | O | REGISTERED-SEC.71 ACCEPTED | Loading... |
| Aug 13, 2021 | APRE | A | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | Loading... |
| May 9, 2021 | ADCH | M | CHANGE OF NAME/ADDRESS REC'D FROM IB | Loading... |
| Apr 9, 2021 | ES71 | I | TEAS SECTION 71 RECEIVED | Loading... |
| Oct 12, 2019 | REM4 | E | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | Loading... |
| Aug 29, 2019 | RNWL | P | INTERNATIONAL REGISTRATION RENEWED | Loading... |
| Mar 24, 2017 | NA75 | E | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | Loading... |
| Mar 24, 2017 | C75A | O | REGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK. | Loading... |
| Mar 24, 2017 | APRE | A | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | Loading... |
| Oct 10, 2016 | ES75 | I | TEAS SECTION 71 & 15 RECEIVED | Loading... |
| Dec 18, 2015 | TCCA | I | TEAS CHANGE OF CORRESPONDENCE RECEIVED | Loading... |
| Mar 19, 2015 | NREP | P | NEW REPRESENTATIVE AT IB RECEIVED | Loading... |
| Oct 26, 2013 | ADCH | M | CHANGE OF NAME/ADDRESS REC'D FROM IB | Loading... |
| Feb 18, 2013 | FINO | P | FINAL DECISION TRANSACTION PROCESSED BY IB | Loading... |
| Jan 14, 2011 | FICS | P | FINAL DISPOSITION NOTICE SENT TO IB | Loading... |
| Jan 14, 2011 | FIMP | P | FINAL DISPOSITION PROCESSED | Loading... |
| Jan 12, 2011 | FICR | P | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | Loading... |
| Oct 12, 2010 | R.PR | A | REGISTERED-PRINCIPAL REGISTER | Loading... |
| Jul 27, 2010 | NPUB | E | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | Loading... |
| Jul 27, 2010 | PUBO | A | PUBLISHED FOR OPPOSITION | Loading... |
| Jun 23, 2010 | PREV | O | LAW OFFICE PUBLICATION REVIEW COMPLETED | Loading... |
| Jun 23, 2010 | ALIE | A | ASSIGNED TO LIE | Loading... |
| Jun 8, 2010 | CNSA | O | APPROVED FOR PUB - PRINCIPAL REGISTER | Loading... |
| May 19, 2010 | TEME | I | TEAS/EMAIL CORRESPONDENCE ENTERED | Loading... |
| May 18, 2010 | CRFA | I | CORRESPONDENCE RECEIVED IN LAW OFFICE | Loading... |
| May 18, 2010 | TCCA | I | TEAS CHANGE OF CORRESPONDENCE RECEIVED | Loading... |
| May 18, 2010 | TROA | I | TEAS RESPONSE TO OFFICE ACTION RECEIVED | Loading... |
| Dec 18, 2009 | RFNT | P | REFUSAL PROCESSED BY IB | Loading... |
| Nov 20, 2009 | RFCS | P | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | Loading... |
| Nov 20, 2009 | RFRR | P | REFUSAL PROCESSED BY MPU | Loading... |
| Nov 19, 2009 | RFCR | E | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | Loading... |
| Nov 18, 2009 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
| Nov 14, 2009 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
| Oct 27, 2009 | MAFR | O | APPLICATION FILING RECEIPT MAILED | Loading... |
| Oct 23, 2009 | NWOS | I | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | Loading... |
| Oct 22, 2009 | REPR | M | SN ASSIGNED FOR SECT 66A APPL FROM IB | Loading... |
Detailed Classifications
Class 007
Machines and installations composed thereof for regenerative energy production, namely, wind turbines, current generators, electric generators, wind energy converters, windmills, towers, rotor blades and rotors for wind turbines and parts for these machines, namely, slewing rings, drives for adjusting the rotor blades, drive trains e.g. consisting of a rotor hub, a rotor shaft, a gearbox, a coupling and a generator, gearboxes, brakes, nacelles, wind direction sensors, anemometers
Class 009
Electric apparatus, instruments and machines, namely, electric circuits, frequency converter, measuring instruments, signaling instruments, controlling instruments, [ data processing equipment and ] electric protection devices, namely, lightning protectors, fault-voltage protective switches, fault-current protection switches, ground fault circuit interrupters, used especially against electrical surge, over-current, false current, short circuits, also for use in installations for wind energy production; computer software for controlling wind turbines
Class 037
Installation, development, construction and assembling, maintenance and repair of wind turbines and their parts; installation of wind parks, namely, installation, development, construction, assembling, maintenance and repair of [ energy networks, substation, grid connection, ] wind turbines [, communication networks, access roads for wind parks, crane areas for wind parks and other civil infrastructure for wind parks ]
Class 042
Technical operation and technical support of operation of wind parks for others, technical consulting services relating to the technical operation of wind turbines; conducting research projects concerning wind turbines and their parts; technical development and technical inspection service of wind turbines and their parts
Additional Information
Design Mark
The mark consists of three ribbons that run parallel to each other and form a rounded loop, which has an opening to the right.
Color Claim
Color is not claimed as a feature of the mark.
Classification
International Classes
007
009
037
042