Legal Representation
Attorney
Richard W. James
USPTO Deadlines
Next Deadline
1417 days remaining
Section 8 & 9 (20-Year) Renewal Due (Based on registration date 2009-06-02)
Due Date
June 02, 2029
Grace Period Ends
December 02, 2029
Application History
50 eventsDate | Code | Type | Description | Documents |
---|---|---|---|---|
Jul 12, 2019 | APRE | A | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | Loading... |
Jul 12, 2019 | 89AG | O | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | Loading... |
Jul 12, 2019 | RNL1 | Q | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | Loading... |
Jul 12, 2019 | NA89 | E | NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED | Loading... |
Jun 3, 2019 | E89R | I | TEAS SECTION 8 & 9 RECEIVED | Loading... |
Jun 2, 2018 | REM2 | E | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | Loading... |
Jun 6, 2015 | APRE | A | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | Loading... |
Jun 6, 2015 | 8.OK | O | REGISTERED - SEC. 8 (6-YR) ACCEPTED | Loading... |
Jun 6, 2015 | NAS8 | E | NOTICE OF ACCEPTANCE OF SEC. 8 - E-MAILED | Loading... |
Jun 2, 2015 | ES8R | I | TEAS SECTION 8 RECEIVED | Loading... |
Jun 2, 2009 | R.SR | A | REGISTERED-SUPPLEMENTAL REGISTER | Loading... |
Apr 28, 2009 | PREV | O | LAW OFFICE PUBLICATION REVIEW COMPLETED | Loading... |
Apr 27, 2009 | CNTA | O | APPROVED FOR REGISTRATION SUPPLEMENTAL REGISTER | Loading... |
Apr 25, 2009 | XAEC | I | EXAMINER'S AMENDMENT ENTERED | Loading... |
Apr 24, 2009 | CNEA | R | EXAMINERS AMENDMENT -WRITTEN | Loading... |
Apr 24, 2009 | GNEA | O | EXAMINERS AMENDMENT E-MAILED | Loading... |
Apr 24, 2009 | GNEN | O | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | Loading... |
Apr 2, 2009 | TEME | I | TEAS/EMAIL CORRESPONDENCE ENTERED | Loading... |
Apr 1, 2009 | TROA | I | TEAS RESPONSE TO OFFICE ACTION RECEIVED | Loading... |
Apr 1, 2009 | CRFA | I | CORRESPONDENCE RECEIVED IN LAW OFFICE | Loading... |
Oct 1, 2008 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
Oct 1, 2008 | GNRT | O | NON-FINAL ACTION E-MAILED | Loading... |
Oct 1, 2008 | GNRN | O | NOTIFICATION OF NON-FINAL ACTION E-MAILED | Loading... |
Sep 19, 2008 | PROA | I | TEAS PETITION TO REVIVE RECEIVED | Loading... |
Sep 19, 2008 | PETG | O | PETITION TO REVIVE-GRANTED | Loading... |
Sep 19, 2008 | TROA | I | TEAS RESPONSE TO OFFICE ACTION RECEIVED | Loading... |
Sep 19, 2008 | CRFA | I | CORRESPONDENCE RECEIVED IN LAW OFFICE | Loading... |
Sep 19, 2008 | TEME | I | TEAS/EMAIL CORRESPONDENCE ENTERED | Loading... |
Jul 28, 2008 | ABN2 | O | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | Loading... |
Jul 28, 2008 | MAB2 | O | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | Loading... |
Jul 10, 2008 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
Dec 28, 2007 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
Dec 28, 2007 | GNRT | O | NON-FINAL ACTION E-MAILED | Loading... |
Dec 28, 2007 | GNRN | O | NOTIFICATION OF NON-FINAL ACTION E-MAILED | Loading... |
Dec 5, 2007 | ZZZX | Z | PREVIOUS ALLOWANCE COUNT WITHDRAWN | Loading... |
Nov 26, 2007 | ALIE | A | ASSIGNED TO LIE | Loading... |
Oct 22, 2007 | CNTA | O | APPROVED FOR REGISTRATION SUPPLEMENTAL REGISTER | Loading... |
Sep 20, 2007 | ERFR | I | TEAS REQUEST FOR RECONSIDERATION RECEIVED | Loading... |
Sep 20, 2007 | CRFA | I | CORRESPONDENCE RECEIVED IN LAW OFFICE | Loading... |
Sep 20, 2007 | TEME | I | TEAS/EMAIL CORRESPONDENCE ENTERED | Loading... |
Sep 4, 2007 | CNFR | R | FINAL REFUSAL WRITTEN | Loading... |
Sep 4, 2007 | GNFR | O | FINAL REFUSAL E-MAILED | Loading... |
Sep 4, 2007 | GNFN | O | NOTIFICATION OF FINAL REFUSAL EMAILED | Loading... |
Jul 24, 2007 | TEME | I | TEAS/EMAIL CORRESPONDENCE ENTERED | Loading... |
Jul 23, 2007 | TROA | I | TEAS RESPONSE TO OFFICE ACTION RECEIVED | Loading... |
Jul 23, 2007 | CRFA | I | CORRESPONDENCE RECEIVED IN LAW OFFICE | Loading... |
Jan 22, 2007 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
Jan 22, 2007 | GNRT | O | NON-FINAL ACTION E-MAILED | Loading... |
Dec 27, 2006 | TEME | I | TEAS/EMAIL CORRESPONDENCE ENTERED | Loading... |
Dec 26, 2006 | TROA | I | TEAS RESPONSE TO OFFICE ACTION RECEIVED | Loading... |
Detailed Classifications
Class 008
Hand operated tools, namely, masonry trowels, masonry tile setter floats, masonry jointers, masonry pointing tools, namely, tools used to form finished joints in masonry, caulking trowels, masonry sledrunners, brick sets, masonry chisels, block splitters, brick splitters, paver and wall splitters, wall unit splitters, wall lifters, wall unit lifters, wall unit tongs, sand rakes, base rakes, paver extracting tongs, extracting and alignment bars, slab movers, curb tongs, line stretchers, line twigs, brick tongs, brick carriers, wall scrapers, adjustable backing rod installer sets, post hole digging and tamping bars, stripping bars, wrecking bars, slate bars, jimmy bars, digging bars, rocker bars, ripping bars, utility bars, nail pullers, shovels, rakes, shingle rippers, roof rollers, roof seam rollers, punches, manually operated concrete floats, concrete darbies, concrete edgers, concrete groovers, trowels, manually operated screeds, manually operated concrete tampers, concrete chute scrapers, placers, concrete rakes, manually operated pump line drags for concrete placement, mesh lifters, namely, a manually operated tool for enabling the user to lift reinforcing steel mesh during concrete placement, rebar benders, stake pullers, asphalt irons, manually operated crack filling devices for holding asphalt filling compositions and applying the same, asphalt rakes, concrete imprint rollers, concrete texture rollers, floor covering tools, namely, flooring shears, floor scrapers and rollers, carpet stretchers, knee kickers, seam rollers, carpet rollers, grout compression tools, hacksaws, linoleum rollers, floor scrapers, laminate scoring tools, laminate shears, drywall taping knives. drywall joint knives, detail knives, drywall scoring knife with measuring gauges, hand mixers, drywall saws, drywall lifters, manually operated scarifiers for plastering, and stud channel shears
First Use Anywhere:
Jan 31, 2000
First Use in Commerce:
Jan 31, 2000
Additional Information
Design Mark
The mark consists of the color blue, particularly the shade of blue identified as Pantone 288, as applied to the handle of hand tools, namely, masonry trowels, masonry tile setter floats, masonry jointers, masonry pointing tools, namely, tools used to form finished joints in masonry, caulking trowels, masonry sledrunners, brick sets, masonry chisels, block splitters, brick splitters, paver and wall splitters, wall unit splitters, wall lifters, wall unit lifters, wall unit tongs, sand rakes, base rakes, paver extracting tongs, extracting and alignment bars, slab movers, curb tongs, line stretchers, line twigs, brick tongs, brick carriers, wall scrapers, adjustable backing rod installer sets, post hole digging and tamping bars, stripping bars, wrecking bars, slate bars, jimmy bars, digging bars, rocker bars, ripping bars, utility bars, nail pullers, shovels, rakes, shingle rippers, roof rollers, roof seam rollers, punches, manually operated concrete floats, concrete darbies, concrete edgers, concrete groovers, trowels, manually operated screeds, manually operated concrete tampers, concrete chute scrapers, placers, concrete rakes, manually operated pump line drags for concrete placement, mesh lifters, namely, a manually operated tool for enabling the user to lift reinforcing steel mesh during concrete placement, rebar benders, stake pullers, asphalt irons, manually operated crack filling devices for holding asphalt filling compositions and applying the same, asphalt rakes, concrete imprint rollers, concrete texture rollers, floor covering tools, namely, flooring shears, floor scrapers and rollers, carpet stretchers, knee kickers, seam rollers, carpet rollers, grout compression tools, hacksaws, linoleum rollers, floor scrapers, laminate scoring tools, laminate shears, drywall taping knives. drywall joint knives, detail knives, drywall scoring knife with measuring gauges, hand mixers, drywall saws, drywall lifters, manually operated scarifiers for plastering, and stud channel shears. The dotted outline of the goods is intended to show the position of the mark on the goods and is not part of the mark.
Color Claim
The color(s) blue, particularly the shade of blue identified as Pantone 288, is/are claimed as a feature of the mark.
Classification
International Classes
008